Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Fixing Of Shotblasted Interlocking Pavers From Shrikant Kankonkar House To Shree Nagesh Devasthan At Nagali,V.P.Taleigao In Taleigao Zp Constituency.
|
Description |
Providing And Fixing Of Shotblasted Interlocking Pavers From Shrikant Kankonkar House To Shree Nagesh Devasthan At Nagali,V.P.Taleigao In Taleigao Zp Constituency.
|
Organisation | ZILLA PANCHAYATS | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 6062 |
EMD | 10618 |
Tender Value | |
Place | North Goa Zilla Panchayat |
Link |
AAAAAAAAAA Login to view |
Start Date | June 18, 2025 15:30 |
End Date |
24/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Read moreConstruction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreImprovement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Improvement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Construction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Read moreConstruction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41
Construction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41
Read moreLaying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Read moreof your Industry type