Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constr Of 04 Nos Maj Pmt Br Steel Super 45 M Span At Km 52.425 Over Galo Nallah, 45 M Span At Km 57.425 Over Kogi Nallah,35 M Span At Km 60.80 And 35 M Span At Km 63.30 Over Kojup Nallah On Rd T N Under 77 Rcc Of 23 Tf/(P) Arunank In A.P Epc Mode
|
| Description |
Constr Of 04 Nos Maj Pmt Br Steel Super 45 M Span At Km 52.425 Over Galo Nallah, 45 M Span At Km 57.425 Over Kogi Nallah,35 M Span At Km 60.80 And 35 M Span At Km 63.30 Over Kojup Nallah On Rd T N Under 77 Rcc Of 23 Tf/(P) Arunank In A.P Epc Mode.
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2024_BRO_683397_1 |
|
Reference Number |
ANK/NIT-06/2024-25 |
| Tender Fee | 10000 |
| EMD | 15.58 Lakh |
| Tender Value | |
| Place | At Km 52.425,57.425,60.08,63.03 TN Rd under 23TF |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=764764 |
| Start Date | December 10, 2024 21:30 |
| End Date |
Expired
27/12/2024
Expired 530 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design and construction of 40 mtr span maj pmt bridge at km 23.5 over angropani nallah and 35 mtr span maj pmt bridge at km 27.75 over avapani nallah on open foundation with steel superstructure in arunachal pradesh state in epc mode
Design and construction of 40 mtr span maj pmt bridge at km 23.5 over angropani nallah and 35 mtr span maj pmt bridge at km 27.75 over avapani nallah on open foundation with steel superstructure in arunachal pradesh state in epc mode
Read moreDsgn constr,50mtr span maj pmt br steel super structure(through type) over existing abutments (needs to be modification of existing abutment increase in height) over menga river km 15.630 on d-t rd under 77 rcc/23tf/p ank in upper subansiri in a.p.
Dsgn constr,50mtr span maj pmt br steel super structure(through type) over existing abutments (needs to be modification of existing abutment increase in height) over menga river km 15.630 on d-t rd under 77 rcc/23tf/p ank in upper subansiri in a.p.
Read moreConstr of 45 mtr span pmt bridge ( superstruture psc box type) at km 1.60 (over devi nallah) and 55 mtr span pmt bridge (through type steel superstructure) at km 10.200 (over chopo nallah) on h m h rd under 752 tf (p) udayak in arunachal pradesh st
Constr of 45 mtr span pmt bridge ( superstruture psc box type) at km 1.60 (over devi nallah) and 55 mtr span pmt bridge (through type steel superstructure) at km 10.200 (over chopo nallah) on h m h rd under 752 tf (p) udayak in arunachal pradesh st
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreSub soil investigation, design, drg and constr of 80 m span major pmt shere thapa bridge over ismi-siko nallah including approach roads at km 0.630 on road tcc-maza through epc mode under 128 rcc / 23 brtf/project arunank in arunachal pradesh.
Sub soil investigation, design, drg and constr of 80 m span major pmt shere thapa bridge over ismi-siko nallah including approach roads at km 0.630 on road tcc-maza through epc mode under 128 rcc / 23 brtf/project arunank in arunachal pradesh.
Read moreSs investigation design drawing const of 03 maj pmt br steel superstructure alongwith both approach roads in respect of 45 mtr span at km 23.450, 60 mtr span at km 30.425 and 75 mtr span at km 36.600 on rd n-tcc under 128rcc of 23 tf p ank in a.p
Ss investigation design drawing const of 03 maj pmt br steel superstructure alongwith both approach roads in respect of 45 mtr span at km 23.450, 60 mtr span at km 30.425 and 75 mtr span at km 36.600 on rd n-tcc under 128rcc of 23 tf p ank in a.p
Read moreSsi, design, drawing const of 04 maj pmt br with steel superstructure both approach respect of 50 mtr span at km 9.120, 50 mtr span at km 11.650, 50 mtr span at km 15.60 and 50 mtr span at km 44.05 on rd tcc taksing 128 rcc of 23 tf (p) ank in a.p
Ssi, design, drawing const of 04 maj pmt br with steel superstructure both approach respect of 50 mtr span at km 9.120, 50 mtr span at km 11.650, 50 mtr span at km 15.60 and 50 mtr span at km 44.05 on rd tcc taksing 128 rcc of 23 tf (p) ank in a.p
Read moreSub soil invest design, drawing const of 03maj pmt br steel superstructure both approach rd in respect of 75mtr span over gazi nallah at km 41.030, 45mtr span at km 44.890and60mtr span at km 49.890 on rd n-tcc under 128rcc of 23tf p ank in a.p
Sub soil invest design, drawing const of 03maj pmt br steel superstructure both approach rd in respect of 75mtr span over gazi nallah at km 41.030, 45mtr span at km 44.890and60mtr span at km 49.890 on rd n-tcc under 128rcc of 23tf p ank in a.p
Read moreDsgn ,const of 60 mtr span maj pmt br with steel super structure(through type) over exist abutments (needs to be modification of existing abutment due to incr in ht)over sippi river at km 10.8 on d-t rd under 23 tf/ p ank in state of a.p
Dsgn ,const of 60 mtr span maj pmt br with steel super structure(through type) over exist abutments (needs to be modification of existing abutment due to incr in ht)over sippi river at km 10.8 on d-t rd under 23 tf/ p ank in state of a.p
Read moreSsi, dgn and constr of two nos maj pmt bdg of span 50 m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/ 24 tf under project pushpak in mizoram
Ssi, dgn and constr of two nos maj pmt bdg of span 50 m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/ 24 tf under project pushpak in mizoram
Read moreof your Industry type