Tender Details
Particulars | Details |
---|---|
Title |
Renewal Work Of Ujhani Railway Fatak To Sakri Jungle Via Adauli Km 1(175) And Ujhani Khiriyavakarpur Km 5 From Village Burra To Burra Mandir Km 1(150) Under Shekhupur Vidhansabha District Budaun
|
Description |
Renewal Work Of Ujhani Railway Fatak To Sakri Jungle Via Adauli Km 1(175) And Ujhani Khiriyavakarpur Km 5 From Village Burra To Burra Mandir Km 1(150) Under Shekhupur Vidhansabha District Budaun
|
Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
Tender Id | 2025_CEBLY_997415_1 |
Reference Number |
92(84)/Nivida/2025 Dt. 15-01-2025 |
Tender Fee | 767 |
EMD | 35000 |
Tender Value | |
Place | Budaun |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1769509 |
Start Date | January 24, 2025 14:30 |
End Date |
31/01/2025 ( Expired 109 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreWbpwd/pw(r)/se/shc/nit no 05 of 2025-2026(sl-02)
Permanent protection work of breached portions during flood 2024 from km 3.540 to km 3.600 and km 3.615 to km 3.950 of singti-pancharul road under howrah highway division in the district of howrah.
Read moreGopiballavpur nayagram road from 35.00 km to 41.60km
Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.
Read moreConstruction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)
Construction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)
Read moreWbpwd/pw(r)/sepd/piu-i/nit-08 of 2025-2026,sl-1
Widening and strengthening of ayeshbagh - harirampur road from 0.00 kmp to 17.20 km under murshidabad highway division no. i in the district of murshidabad under ridf xxx. (2nd call)
Read moreUnder district ambedkarnagar ,construction of road and culvert from kumbhapur (atwaai) katehri to agyaram house via namiyahwa , lot no 2
Under district ambedkarnagar ,construction of road and culvert from kumbhapur (atwaai) katehri to agyaram house via namiyahwa , lot no 2&#x0d
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreMtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read morePr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k
Pr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k
Read moreof your Industry type