Tender Details

Particulars Details
Title
Renewal Work Of Ujhani Railway Fatak To Sakri Jungle Via Adauli Km 1(175) And Ujhani Khiriyavakarpur Km 5 From Village Burra To Burra Mandir Km 1(150) Under Shekhupur Vidhansabha District Budaun
Description
Renewal Work Of Ujhani Railway Fatak To Sakri Jungle Via Adauli Km 1(175) And Ujhani Khiriyavakarpur Km 5 From Village Burra To Burra Mandir Km 1(150) Under Shekhupur Vidhansabha District Budaun
Organisation Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT
Tender Id 2025_CEBLY_997415_1
Reference
Number
92(84)/Nivida/2025 Dt. 15-01-2025
Tender Fee 767
EMD 35000
Tender Value
Place Budaun
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1769509
Start Date January 24, 2025 14:30
End Date

31/01/2025 ( Expired 109 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Wbpwd/pw(r)/se/shc/nit no 05 of 2025-2026(sl-02)

Permanent protection work of breached portions during flood 2024 from km 3.540 to km 3.600 and km 3.615 to km 3.950 of singti-pancharul road under howrah highway division in the district of howrah.

Read more
Gopiballavpur nayagram road from 35.00 km to 41.60km

Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.

Read more
Construction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)

Construction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)

Read more
Wbpwd/pw(r)/sepd/piu-i/nit-08 of 2025-2026,sl-1

Widening and strengthening of ayeshbagh - harirampur road from 0.00 kmp to 17.20 km under murshidabad highway division no. i in the district of murshidabad under ridf xxx. (2nd call)

Read more
Under district ambedkarnagar ,construction of road and culvert from kumbhapur (atwaai) katehri to agyaram house via namiyahwa , lot no 2

Under district ambedkarnagar ,construction of road and culvert from kumbhapur (atwaai) katehri to agyaram house via namiyahwa , lot no 2&amp#x0d

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Read more
Pr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k

Pr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise