Tender Details
Particulars | Details |
---|---|
Title |
Re Strengthening And Re Jumpering Of 440 O.H. Line Of Parej Colony Of Peocp Under Hazaribagh Area.
|
Description |
Re Strengthening And Re Jumpering Of 440 O.H. Line Of Parej Colony Of Peocp Under Hazaribagh Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_298381_1 |
Reference Number |
PO/PEOCP/EnM/Tender/23-24/ 34 |
Tender Fee | 0 |
EMD | 3726 |
Tender Value | |
Place | PEOCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309072 |
Start Date | January 13, 2024 20:30 |
End Date |
23/01/2024 ( Expired 482 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreElectrification work of shifting of 33 kv high tension line passing above buildings of residential area of lawrence line, yadav colony, sudhar nyas colony houses, ward no. 44
Electrification work of shifting of 33 kv high tension line passing above buildings of residential area of lawrence line, yadav colony, sudhar nyas colony houses, ward no. 44
Read moreZonal work ward 01 to 12 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Zonal work ward 01 to 12 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreBiennial maintenance contract for mechanical maintenance work of effluent treatment plant(etp) and dismantling and re-assembly of submersible motor of etp under ahp-mm and em. for two years.
Biennial maintenance contract for mechanical maintenance work of effluent treatment plant(etp) and dismantling and re-assembly of submersible motor of etp under ahp-mm and em. for two years.
Read moreConstruction of boundary wall on backline in the middle of saf line and narayan bagh in ward no. 57 under zone no. 03
Construction of boundary wall on backline in the middle of saf line and narayan bagh in ward no. 57 under zone no. 03
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur
Construction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur (under op. circle kapurthala) (twl no. 60/nz/2023-24/annex-b)
Read moreMtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Mtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Read moreof your Industry type