Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Tender Dhani Raipur, Repair Of Chamar Chopal ( Completion ) (Zp)
|
| Description |
Re Tender Dhani Raipur, Repair Of Chamar Chopal ( Completion ) (Zp)
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HRY_332570_1 |
|
Reference Number |
20238310967D 48A4 4F04 B26E FAA8E3F7AE912022DEV |
| Tender Fee | 500 |
| EMD | 15486 |
| Tender Value | - |
| Place | Executive Engineer Hisar |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | December 04, 2023 14:30 |
| End Date |
Expired
12/12/2023
Expired 1038 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re-tender dariyapur- const of sc choupal in dhani sekhanwali at village- dariyapur block/dist.- fatehabad (mpladas )
Re-tender dariyapur- const of sc choupal in dhani sekhanwali at village- dariyapur block/dist.- fatehabad (mpladas )
Read moreAnnual plan-dpk project no -s0614/26-uzhavoor division veliyannor gp thmarakkadu anganvadi completion-general electrical work (re-tender)
Annual plan-dpk project no -s0614/26-uzhavoor division veliyannor gp thmarakkadu anganvadi completion-general electrical work (re-tender)
Read moreAnnual plan-annual plan chalissery gp 2026- 27, pro no 68 completion of puliyannjalil road -re concreeting-general civil work
Annual plan-annual plan chalissery gp 2026- 27, pro no 68 completion of puliyannjalil road -re concreeting-general civil work
Read moreCompletion of drain from house of tarsem lal to house of gurmeet singh ,raipur sajdeh pyt baspur block r.s.pura. ac suchetgarh under scheme mla- cdf for the financial year 2025-26.
Completion of drain from house of tarsem lal to house of gurmeet singh ,raipur sajdeh pyt baspur block r.s.pura. ac suchetgarh under scheme mla- cdf for the financial year 2025-26.
Read moreCarrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Read moreInstallation of 05 (five) nos. steel pontoons at kachuberia for holding the gangways of semi-permanent jetties in connection with ganga sagar mela 2027 and re -placement of the same at their original positions after completion of mela operation.
Installation of 05 (five) nos. steel pontoons at kachuberia for holding the gangways of semi-permanent jetties in connection with ganga sagar mela 2027 and re -placement of the same at their original positions after completion of mela operation.
Read moreProviding and laying water supply from booster to tibri mohalla and sewerage line in dhani mohalla to sector 21, bank wali gali sunar wali gali and tibri mohalla reconstruction of gali in bank wali gali sunar wali gali, tibri mohalla. re-call
Providing and laying water supply from booster to tibri mohalla and sewerage line in dhani mohalla to sector 21, bank wali gali sunar wali gali and tibri mohalla reconstruction of gali in bank wali gali sunar wali gali, tibri mohalla. re-call
Read moreInstallation of 04 (four) nos. steel pontoons at lot - 8 for holding the gangway of semi-permanent jetties in connection with ganga sagar mela 2027 and re - placement of the same at their original positions after completion of mela operation.
Installation of 04 (four) nos. steel pontoons at lot - 8 for holding the gangway of semi-permanent jetties in connection with ganga sagar mela 2027 and re - placement of the same at their original positions after completion of mela operation.
Read moreof your Industry type