Tender Details

Particulars Details
Title
Provoiding,Laying And Fitting Of 100mm Dia Rising Main And Construction Of Dug Well At Menser Farm Phey Village(under Capex)
Description
Provoiding,Laying And Fitting Of 100mm Dia Rising Main And Construction Of Dug Well At Menser Farm Phey Village(under Capex)
Organisation Public Works Department | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1000
EMD 28000
Tender Value
Place LEH
Link

AAAAAAAAAA

Login to view
Start Date June 14, 2025 23:30
End Date

02/07/2025 ( 16 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh

Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6

Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6

Read more
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6

Read more
Construction of rrm protection wall at new tower no.: 04

Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise