Tender Details

Particulars Details
Title
Mtps I M I Ca Cws Ii Complete Dismantling Inspection Overhaul Including Renewal Of Wornout Pump Components And Assembling In Any 2 Nos Of Cwp In Stage Ii
Description
Mtps I M I Ca Cws Ii Complete Dismantling Inspection Overhaul Including Renewal Of Wornout Pump Components And Assembling In Any 2 Nos Of Cwp In Stage Ii
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_501317_1
Reference
Number
CE / MTPS-I / SE / M-I / CA /OT. 255 / 2024-25
Tender Fee 0
EMD 7700
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=596105

Start Date November 14, 2024 23:30
End Date
Expired 28/11/2024

Expired 684 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i mill plant unit ii dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2026 27

Mtps i mill plant unit ii dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2026 27

Read more
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27

Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27

Read more
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical

Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical

Read more
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Read more
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Read more
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Mtps i m i ca cws ii unit iv complete dismantling inspection overhaul including renewal of worn-out pump components and assembling and replacement of damaged rubber expansion joint of cwp 4c of stage ii

Mtps i m i ca cws ii unit iv complete dismantling inspection overhaul including renewal of worn-out pump components and assembling and replacement of damaged rubber expansion joint of cwp 4c of stage ii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise