Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Unit Iv Overhauling Of Seal Air Fans During Forthcoming Annual Overhaul
|
Description |
Ttps Operation Circle Mpm Ii Unit Iv Overhauling Of Seal Air Fans During Forthcoming Annual Overhaul
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_559083_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.120/25-26 |
Tender Fee | 0 |
EMD | 1900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=667719 |
Start Date | May 17, 2025 18:40 |
End Date |
02/06/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual overhauling of turbine and generator of unit no.-3 of 3x210mw, atps, anpara
Annual overhauling of turbine and generator of unit no.-3 of 3x210mw, atps, anpara
Read moreIn situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
In situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
Read moreAnnual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.
Annual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.
Read moreRadiography and ultrasound testing of welding joints in cpp boiler during overhauling-01 unit.
Radiography and ultrasound testing of welding joints in cpp boiler during overhauling-01 unit.
Read moreSupply of spares for guide vanes of id fans and damper assembly of seal air fans
Supply of spares for guide vanes of id fans and damper assembly of seal air fans
Read moreOverhauling of cw and rcw pump during upcoming overhauling of unit 5 (215 mw)
Overhauling of cw and rcw pump during upcoming overhauling of unit 5 (215 mw)&#x0d
Read moreCondenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Condenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreProcurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl
Procurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl.
Read moreWork contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreof your Industry type