Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Ahp Unit I Ii Iii Breakdown Maintenance Works Of Hdpe Pipes And Fittings Of Size 40mm And 75mm Od And Rubber Lining Of 80 Nb To 450 Nb Ms Pipes Fittings Flushing Apparatus In Unit I Ii Iii Eco Aph Hoppers For The Period From 01 04 2
|
Description |
Ttps Mech Ii Ahp Unit I Ii Iii Breakdown Maintenance Works Of Hdpe Pipes And Fittings Of Size 40mm And 75mm Od And Rubber Lining Of 80 Nb To 450 Nb Ms Pipes Fittings Flushing Apparatus In Unit I Ii Iii Eco Aph Hoppers For The Period From 01 04 2
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527740_1 |
Reference Number |
CE/TTPS/SE/M-II/No.54/2025-26 |
Tender Fee | 0 |
EMD | 7700 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628423 |
Start Date | February 25, 2025 23:30 |
End Date |
12/03/2025 ( Expired 63 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii ahp unit iii pdfac system erection and commissioning of oil injected air cooled screw type single stage 160kw rotary air compressor with related accessories for unit iii pdfac system
Ttps mech ii ahp unit iii pdfac system erection and commissioning of oil injected air cooled screw type single stage 160kw rotary air compressor with related accessories for unit iii pdfac system
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii
Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii
Read moreTtps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Ttps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Read moreTtps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iii for the period from 01 04 2025 to 3103 2026
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iii for the period from 01 04 2025 to 3103 2026
Read moreTtps mech ii ahp unit iv bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 04 2025 to 31 03 2026
Ttps mech ii ahp unit iv bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 04 2025 to 31 03 2026
Read moreof your Industry type