Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Mustard Oil Cake To The Amarpur Sub Divisions Of The State Of Tripura
|
Description |
Supply Of Mustard Oil Cake To The Amarpur Sub Divisions Of The State Of Tripura For Implementation Of Different Pisciculture Schemes During 2023 24
|
Organisation | Government of Tripura |
Tender Id | 2023_FISH_40352_1 |
Reference Number |
No.F.3(90)-SF(AMP)/2022-23/616 |
Tender Fee | 1000 |
EMD | 11844 |
Tender Value | |
Place | Office of the Superintendent of Fisheries_Amarpur |
Link | https://tripuratenders.gov.in |
Start Date | August 08, 2023 16:30 |
End Date |
15/08/2023 ( Expired 681 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreDraft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreComplete outsourcing of labour jobs for erection, pre-testing and commissioning of u/g 66 kv sub-station to 220kv sub-station ajnala.
Complete outsourcing of labour jobs for erection, pre-testing and commissioning of u/g 66 kv sub-station to 220kv sub-station ajnala.
Read moreManufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreProcurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Read moreof your Industry type