Tender Details

Particulars Details
Title
Ohe Modification Work Against Sanctioned Ph 32 Work Over Firozpur Division In C/W Replacement Of Existing Steel Girder Of Bridge No. 44, 51, 57, 59 (46 Nos. X 9.15m) On Up & Dn Line Juc Bes Section Under Aden/Juc Over Firozpur Division.
Description
Ohe Modification Work Against Sanctioned Ph 32 Work Over Firozpur Division In C/W Replacement Of Existing Steel Girder Of Bridge No. 44, 51, 57, 59 (46 Nos. X 9.15m) On Up & Dn Line Juc Bes Section Under Aden/Juc Over Firozpur Division.
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 16, 2026 20:50
End Date
Open 10/11/2026

23 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Provision of new psi equipments by replacement of overaged psi equipments to improve the reliability of ohe over firozpur division.

Provision of new psi equipments by replacement of overaged psi equipments to improve the reliability of ohe over firozpur division.

Read more
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a

Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a

Read more
Ohe modification work against sanctioned works under ph-53 over firozpur division in c/w (i)- raising of passenger platform from rl/ll to hl pass. pf at 08 stations blnd, kupr, ldw, bhm, jjj, gsr, kash, scq & mxp under sr.den-i/fzr, (ii)- provision of standard ramp for passenger to existing fob at 06 stations hussainpur, sultanpur lodhi, lohian khas, malawala khas, firozpur city & jalalabad under den/hq/fzr and (iii)- provision of standard ramp for passanger to existing fobs at 06 stat

Ohe modification work against sanctioned works under ph-53 over firozpur division in c/w (i)- raising of passenger platform from rl/ll to hl pass. pf at 08 stations blnd, kupr, ldw, bhm, jjj, gsr, kash, scq & mxp under sr.den-i/fzr, (ii)- provision of standard ramp for passenger to existing fob at 06 stations hussainpur, sultanpur lodhi, lohian khas, malawala khas, firozpur city & jalalabad under den/hq/fzr and (iii)- provision of standard ramp for passanger to existing fobs at 06 stat

Read more
S&t work in c/w (1) repl. of steel girder with rcc slab of bridge no.102 up&dn, 111 up&dn, 119 up on juc-asr sec., b.no.180 on asr-att & br. no.103 on vka-dbnk section. (ii) construction of lhs of internal size 5 m x 3.5 m lhs in lieu of lc c-7 at km 4/13-14 on juc-nro section under aden-juc over firozpur division. (iii) construction of lhs of internal size 5.0 x 5.0m at manned l-xings no.a-5 on vka-dbnk section by pushing method in the section under aden-i/asr. (iv) constructi

S&t work in c/w (1) repl. of steel girder with rcc slab of bridge no.102 up&dn, 111 up&dn, 119 up on juc-asr sec., b.no.180 on asr-att & br. no.103 on vka-dbnk section. (ii) construction of lhs of internal size 5 m x 3.5 m lhs in lieu of lc c-7 at km 4/13-14 on juc-nro section under aden-juc over firozpur division. (iii) construction of lhs of internal size 5.0 x 5.0m at manned l-xings no.a-5 on vka-dbnk section by pushing method in the section under aden-i/asr. (iv) constructi

Read more
Ohe modification work against sanctioned ph-30 works over firozpur division in c/w (i)- construction of lhs of internal size 5.0m x 3.0m at manned l-xings no. s-1 on asr-vka section by pushing method in the section under aden-i/asr and (ii)- construction of lhs (5.00m x 5.00m) internal size on b-route vandhe bharat in lieu of lc no. s-81 at km 405/1-3 on snl-asr section under aden-ldh

Ohe modification work against sanctioned ph-30 works over firozpur division in c/w (i)- construction of lhs of internal size 5.0m x 3.0m at manned l-xings no. s-1 on asr-vka section by pushing method in the section under aden-i/asr and (ii)- construction of lhs (5.00m x 5.00m) internal size on b-route vandhe bharat in lieu of lc no. s-81 at km 405/1-3 on snl-asr section under aden-ldh

Read more
Ohe modification work against sanctioned ph-30 works over firozpur division in c/w (i)- construction of lhs of internal size 5.0m x 5.0m at manned l-xings no. a-5 on vka-dbnk section by pushing method in the section under aden-ii/asr, (ii)- construction of lhs having internal size 1 x 5.0m x 5.0m by pushing method at km 4/14-15 on vka-dbnk section and (iii)-provision of lhs 3.00m x 2.50m in lieu of tress passing location at km 39/3-4 in bat yard on asr-ptk section.

Ohe modification work against sanctioned ph-30 works over firozpur division in c/w (i)- construction of lhs of internal size 5.0m x 5.0m at manned l-xings no. a-5 on vka-dbnk section by pushing method in the section under aden-ii/asr, (ii)- construction of lhs having internal size 1 x 5.0m x 5.0m by pushing method at km 4/14-15 on vka-dbnk section and (iii)-provision of lhs 3.00m x 2.50m in lieu of tress passing location at km 39/3-4 in bat yard on asr-ptk section.

Read more
A-electrical work in c/w interlocking of 4 no s manned l-xing gates in c/w raising of sectional speed up to 130 kmph of juc- asr section on over fzr division. b-electrical work in c/w interlocking of 5 no s non-interlocked l-xing gates having tvu >50000 over firozpur division. c- electrical work in c/w provision of ibs between mow-asr, hmr-diw and jrc - ceu on snl-asr section d-electrical work in c/w conversion of bh-01, bttn and maul from ibh to ibs on jalandhar catt-sahnewal jn

A-electrical work in c/w interlocking of 4 no s manned l-xing gates in c/w raising of sectional speed up to 130 kmph of juc- asr section on over fzr division. b-electrical work in c/w interlocking of 5 no s non-interlocked l-xing gates having tvu >50000 over firozpur division. c- electrical work in c/w provision of ibs between mow-asr, hmr-diw and jrc - ceu on snl-asr section d-electrical work in c/w conversion of bh-01, bttn and maul from ibh to ibs on jalandhar catt-sahnewal jn

Read more
S&t work for interlocking of 27 nos non-interlocked lc gates having tvu >20000 and < 50000 over firozpur division.list of lc-gates:- jrc-hsx section 6 lc gates(c-2,c-11,c-25, c-34 , c-41,c-49).juc-fzr 11 lc gates (c-6, c-19, c-20, c-24, c-57, c-80, c-88, c-90, c-98, c-118, c-129). phr-lnx 4 lc gates (c-7, c-13, c-20, c-22). fzp-fka 3 lc gates (c-13, c-54, c-58), bti-fzr section 1 lc gate (c-33). kkp-fka 1 lc gate (b2-32), fzr-fzp 1 lc gate (c-59).

S&t work for interlocking of 27 nos non-interlocked lc gates having tvu >20000 and < 50000 over firozpur division.list of lc-gates:- jrc-hsx section 6 lc gates(c-2,c-11,c-25, c-34 , c-41,c-49).juc-fzr 11 lc gates (c-6, c-19, c-20, c-24, c-57, c-80, c-88, c-90, c-98, c-118, c-129). phr-lnx 4 lc gates (c-7, c-13, c-20, c-22). fzp-fka 3 lc gates (c-13, c-54, c-58), bti-fzr section 1 lc gate (c-33). kkp-fka 1 lc gate (b2-32), fzr-fzp 1 lc gate (c-59).

Read more
S&t work for interlocking of 28 nos non-interlocked lc gates having tvu >20000 and < 50000 over firozpur division . list of lc-gates:- asr-kemk section 1 lc gate (c-13), asr-ptk section 3 lc gate (c-15,c-16,c-21), ldh-fzr section 14 lc gates (a-21,b1-30,a-41,b1-45,b2-49,b2-51,a-66,c-67,c-70,c-72,c-73,c-78,c-81,c-84), juc-fzr 2 lc gates (c-4,c-5), bti-fzr section 4 lc gates (c-45,c-51,c-56,c-57), kkp-fka section 4 lc gates (c-3,c-28,c-33,c-58).

S&t work for interlocking of 28 nos non-interlocked lc gates having tvu >20000 and < 50000 over firozpur division . list of lc-gates:- asr-kemk section 1 lc gate (c-13), asr-ptk section 3 lc gate (c-15,c-16,c-21), ldh-fzr section 14 lc gates (a-21,b1-30,a-41,b1-45,b2-49,b2-51,a-66,c-67,c-70,c-72,c-73,c-78,c-81,c-84), juc-fzr 2 lc gates (c-4,c-5), bti-fzr section 4 lc gates (c-45,c-51,c-56,c-57), kkp-fka section 4 lc gates (c-3,c-28,c-33,c-58).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise