Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Yenbodi Palasgaon Kinhi Itoli Gilbili Road (Mdr 22) In Taluka Ballarpur Dist. Chandrapur At Km 0/000 To 1/500 Taluka Ballarpur Dist. Chandrapur
|
Description |
Improvement To Yenbodi Palasgaon Kinhi Itoli Gilbili Road (Mdr 22) In Taluka Ballarpur Dist. Chandrapur At Km 0/000 To 1/500 Taluka Ballarpur Dist. Chandrapur
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWR_949453_1 |
Reference Number |
NAG/CHN/DN2/27-02/2023-24/Open Tender |
Tender Fee | 2360 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Chandrapur |
Link | https://mahatenders.gov.in |
Start Date | October 04, 2023 15:30 |
End Date |
18/10/2023 ( Expired 577 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreImprovement to tangi bhatimunda road from 1/987 km to 2/425 km, 2/700 km to 2/800 km, 3/100 km to 3/625 km and 4/285 km to 5/345 km in the district of cuttack.
Improvement to tangi bhatimunda road from 1/987 km to 2/425 km, 2/700 km to 2/800 km, 3/100 km to 3/625 km and 4/285 km to 5/345 km in the district of cuttack.
Read moreImprovement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Read moreShifting of w/s pipe line from rengali camp chowk to tangarpali for improvement such as widening strengthening of rengali camp to tangarpali road from 0/000 km to 16/818 km in the district of bargarh.
Shifting of w/s pipe line from rengali camp chowk to tangarpali for improvement such as widening strengthening of rengali camp to tangarpali road from 0/000 km to 16/818 km in the district of bargarh.
Read moreStrengthening and black topping of jeur to magarwasti road vr324 km 1/600 to 3/500 taluka dist ahilyanagar
Strengthening and black topping of jeur to magarwasti road vr324 km 1/600 to 3/500 taluka dist ahilyanagar
Read moreConstruction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Read moreDetailed project report and epc documents etc. for construction of high level bridge, tonk bamore banetha road (mdr-309) from km 22/0 to 26/0 with approaches in district tonk
Detailed project report and epc documents etc. for construction of high level bridge, tonk bamore banetha road (mdr-309) from km 22/0 to 26/0 with approaches in district tonk
Read moreImprovements to riding quality at km 0/0-1/357 of existing ghat road
Improvements to riding quality at km 0/0-1/357 of existing ghat road of arulmigu subramaniyaswamy thirukkoil, tiruttani.&#x0d
Read moreof your Industry type