Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Providing Drainage Cover Slabs To Existing Drainages Along Therttamal Odakayam Road Between 1/400 Km To 6/300 Km Ernad Lac General Civil Work
|
| Description |
General Providing Drainage Cover Slabs To&Amp#X0d
Existing Drainages Along Therttamal Odakayam&Amp#X0d
Road Between 1/400 Km To 6/300 Km Ernad&Amp#X0d
Lac General Civil Work
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_689386_1 |
|
Reference Number |
D3/2858/2024 dtd. 04/09/2024 |
| Tender Fee | 2760 |
| EMD | 50000 |
| Tender Value | - |
| Place | Manjeri |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1072878 |
| Start Date | September 04, 2024 22:30 |
| End Date |
Expired
11/09/2024
Expired 764 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction of damaged culvert in kizhuparamba nellarkadavu road between 1/900 km and pottammal from kuniyil new bazar in ernad lac
Reconstruction of damaged culvert in kizhuparamba nellarkadavu road between 1/900 km and pottammal from kuniyil new bazar in ernad lac
Read moreFolder pad,file cover printed color,file cover printed white,file cover without printed,legal paper,paper u clip,register 120 pages,register 150 pages,register 200 pages,register 300 pages,register 400 pages
Folder pad,file cover printed color,file cover printed white,file cover without printed,legal paper,paper u clip,register 120 pages,register 150 pages,register 200 pages,register 300 pages,register 400 pages
Read moreConstruction of c.c. lining and repair of canal structure in between rd 00 m to 300 m and rd 400 m to 3200 m of landibandha distributary of sip.
Repair of canal structures.
Read moreSpgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations
Spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations
Read moreAddn/altn of 02 x or toilet block (p-02) a coy at certain mil unit, provn of control room to accommodation automation eqpt scada at certain mil unit, provn of drainage system approx length 300 mtrs with drain cover slabs adjacent to bldg no p-36 otm
As per tender docus
Read moreNad-kota section: improvement to track drainage system by provision of rcc drain along the track between alaniya-daddevi stations under the jurisdiction of aden-rma.
Nad-kota section: improvement to track drainage system by provision of rcc drain along the track between alaniya-daddevi stations under the jurisdiction of aden-rma.
Read moreRestoration rain damages on solan meenus road km 24/345 to 61/0 (sh construction of w metal crash barrier along with retaining wall between km 34/320 to 34/400) under pdna 2025.
Restoration rain damages on solan meenus road km 24/345 to 61/0 (sh construction of w metal crash barrier along with retaining wall between km 34/320 to 34/400) under pdna 2025.
Read moreTtc and kalwa shifting of 500 mm dia drainage pumping main from plot no pap-571 to 574 and pap-582 to 589 along thane belapur service road between lokmat to dakc.
Ttc and kalwa shifting of 500 mm dia drainage pumping main from plot no pap-571 to 574 and pap-582 to 589 along thane belapur service road between lokmat to dakc.
Read more1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.
1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.
Read moreSw-i: has-sklr section: proposed closure of lc no. 39 at km. 35/300-400 by diverting traffic through lc no.38 at km. 34/900-35/000 duly constructing road parallel to the track between lc no. 39 to lc no 38.sw-ii: mys-has section: proposed closure of lc no. 65 at km. 70/385 by diverting traffic through rob no. 145b at km. 71/216 by construction of a road parallel to track between lc no.65 and rob no.145b
Sw-i: has-sklr section: proposed closure of lc no. 39 at km. 35/300-400 by diverting traffic through lc no.38 at km. 34/900-35/000 duly constructing road parallel to the track between lc no. 39 to lc no 38.sw-ii: mys-has section: proposed closure of lc no. 65 at km. 70/385 by diverting traffic through rob no. 145b at km. 71/216 by construction of a road parallel to track between lc no.65 and rob no.145b
Read moreof your Industry type