Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Routine, Breakdown, Periodical / Prive Maintenance And Shutdown Overhauling Of Ci Equipments / Instruments Installed In Fsss, Asld, Local Plc Systems, Local Gauges, H2 Plant, Ash Water Recovery System Etc.
|
| Description |
At Stage 1 (2x210 Mw) And Stage 2 (2x250 Mw) Guru Hargo Thermal Plant Lehra Mohabbat, Rampura Phul, Distt. Bathinda (Pb)
|
| Organisation | Department of Power | State Govt. and UT |
| Tender Id | 2024_POWER_124744_1 |
|
Reference Number |
370/GHTP/Dy.CE/CI/FSSS/AMC/15 Dated 31/07/2024 |
| Tender Fee | 7080 |
| EMD | 1.86 Lakh |
| Tender Value | |
| Place | Dy. Chief Engineer, CI Circle, GHTP |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=253907 |
| Start Date | July 31, 2024 22:30 |
| End Date |
Expired
27/08/2024
Expired 672 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Routine, breakdown, periodical / preventive maintenance and shutdown overhauling of ci equipments / instruments
Installed in fsss, asld, local plc systems, local gauges, h2 plant, ash water recovery system etc. at ghtp
Read moreRoutine, breakdown, periodical and prive maintenance and shutdown overhauling of c and i equipments and instruments
Installed in fsss, asld, local plc systems, local gauges, h2 plant, ash water recovery system etc. at all units of guru hargothermal plant lehra mohabbat
Read moreRoutine maintenance, breakdown maintenance, periodical / prive maintenance and shutdown overhauling of ci equipments / instruments installed in atrs, generator instrumentation and hpbp system etc at stage 1and 2 of ghtp, lehra mohabbat
Routine maintenance, breakdown maintenance, periodical / prive maintenance and shutdown overhauling of ci equipments / instruments installed in atrs, generator instrumentation and hpbp system etc at stage 1and 2 of ghtp, lehra mohabbat
Read moreRoutine maintenance, breakdown maintenance, periodical / prive maintenance and shutdown overhauling of ci equipments / instruments installed in atrs, generator instrumentation and hp bypass system etc at stage1 and 2 of ghtp, lehra mohabbat
Routine maintenance, breakdown maintenance, periodical / prive maintenance and shutdown overhauling of ci equipments / instruments installed in atrs, generator instrumentation and hp bypass system etc at stage1 and 2 of ghtp, lehra mohabbat
Read moreRoutine maintenance, breakdown maintenance, periodical / prive maintenance and shutdown overhauling of c and i equipments / instruments installed in atrs, generator instrumentation and hpbp system etc at stage 1 and 2 of ghtp, lehra mohabbat
Routine maintenance, breakdown maintenance, periodical / prive maintenance and shutdown overhauling of c and i equipments / instruments installed in atrs, generator instrumentation and hp bypass system etc at stage 1 and 2 of ghtp, lehra mohabba
Read moreRoutine,prive,breakdown and shutdown maintenance of ci equipments instruments, measurement and interlock system, annunciation system, flue gas analyzers, swas, etc., installed at 2x210mw and 2x250mw, ghtp, lehra mohabbat
Routine,prive,breakdown and shutdown maintenance of ci equipments instruments, measurement and interlock system, annunciation system, flue gas analyzers, swas, etc., installed at ghtp, lehra mohabbat, punjab as per details for two years
Read moreRoutinepreventive, breakdown, shutdown maintenance of ci equipments/instruments, measurement interlocks system, annunciation system, flue gas analyzers, steam water analysis system, etc.
Installed at ghtp
Read moreRoutine periodical prive breakdown shutdown maintenance and annual overhauling of 04x210 mw turbo-generators 15.75 kv generator bus duct and allied equipments such as cts vts etc
Routine periodical prive breakdown shutdown maintenance and annual overhauling of 04x210 mw turbo-generators 15.75 kv generator bus duct and allied equipments such as cts vts etc
Read moreRoutine, prive, breakdown, shutdown maintenance of ci equipments,instruments, measurement interlock system, annunciation system, flue gas analyzers, steam water analysis system etc.
Installed at 2x210mw ghtp
Read moreAssistance in breakdown / prive maintenance and annual overhauling of fsss and sadc systems for ggsstp stage-ii and iii units
Assistance in breakdown / prive maintenance and annual overhauling of fsss and sadc systems for ggsstp stage-ii and iii units
Read moreof your Industry type