Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Loading, Transporting, Laying And Jointing Of 6 Inch Dia Gi/Ms Pipe Line And Installation/Shifting Of 1000 Gpm Pump/Motor For Water Supply From Tarmi Ocp To Tarmi Siding And Karipani Colony Under Tarmi Opencast Project.
|
| Description |
Dismantling, Loading, Transporting, Laying And Jointing Of 6 Inch Dia Gi/Ms Pipe Line And Installation/Shifting Of 1000 Gpm Pump/Motor For Water Supply From Tarmi Ocp To Tarmi Siding And Karipani Colony Under Tarmi Opencast Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_323571_1 |
|
Reference Number |
TOCP/PE(EnM)/e.NIT/24-25/10 dt.17.12.2024 |
| Tender Fee | 0 |
| EMD | 4900 |
| Tender Value | - |
| Place | TARMI OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335411 |
| Start Date | December 18, 2024 16:30 |
| End Date |
Expired
28/12/2024
Expired 658 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Handling ,transport and other mining services - percentage quote based - handling & transport service, feeding, crushing, loading and transportation of coal from coal stock yards of tetariakhar ocp to balumath railway siding for a period of one year ..
Handling ,transport and other mining services - percentage quote based - handling & transport service, feeding, crushing, loading and transportation of coal from coal stock yards of tetariakhar ocp to balumath railway siding for a period of one year ..
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreAmc for main pipeline for water distribution kalyani to karipani,tarmi po office to tarmi siding karipani mines to karipani colony and turio colony under sdocm,dhori area.
Amc for main pipeline for water distribution kalyani to karipani,tarmi po office to tarmi siding karipani mines to karipani colony and turio colony under sdocm,dhori area.
Read moreRepair and maintenance of wiring at tarmi ocp sub-station, karipani sub-station, durga mandap and rest shelter and making safety board under tarmi ocp .
Repair and maintenance of wiring at tarmi ocp sub-station, karipani sub-station, durga mandap and rest shelter and making safety board under tarmi ocp .
Read moreElectrical wiring as well as complete lighting arrangement for safety purpose of karipani durga mandap, tarmi durga mandap and tarmi kali mandir in respect of tarmi ocp.
Electrical wiring as well as complete lighting arrangement for safety purpose of karipani durga mandap, tarmi durga mandap and tarmi kali mandir in respect of tarmi ocp.
Read moreRepair and maintenance replacement of pipeline from tarmi ocp quarry to railway siding colony and heth bera and repairing work at karipani under sdocm, dhori area.
Repair and maintenance replacement of pipeline from tarmi ocp quarry to railway siding colony and heth bera and repairing work at karipani under sdocm, dhori area.
Read moreRe-organisation of 11kv oh line of incoming tarmi feeder between karipani substation and tarmi substation under tarmi ocp of dhori area re-organisation of 11kv oh line of inco
Re-organisation of 11kv oh line of incoming tarmi feeder between karipani substation and tarmi substation under tarmi ocp of dhori area
Read moreDismantling and laying for route di of 8 inch dia and 6inch dia gi/ms pipe from tarmi filter plant to tarmi coal stock under tarmi ocp.
Dismantling and laying for route di of 8 inch dia and 6 inch dia gi/ms pipe from tarmi filter plant to tarmi coal stock under tarmi ocp.
Read moreDismantling laying and jointing of 8 inch/6inch dia gi pipe in front of tarmi coal stock up to tarmi check post under sdocm
Dismantling laying and jointing of 8 inch/6inch dia gi pipe in front of tarmi coal stock up to tarmi check post under sdocm
Read moreRepairing, cleaning, painting of 4850 nos 20 kg c.i. test weights of 01 no in motion electronic rail weigh bridge and 02 nos 50te capacity electronic road weigh bridge installed at tarmi siding rail, tarmi siding old and karipani under sdocm, dhori
Repairing, cleaning, painting of 4850 nos 20 kg c.i. test weights of 01 no in motion electronic rail weigh bridge and 02 nos 50te capacity electronic road weigh bridge installed at tarmi siding rail, tarmi siding old and karipani under sdocm, dhori
Read moreof your Industry type