Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr Maintenance Of Pwd Roads (I) Re Carpeting Of Central Road (L 0.35 X 2 Km) And (Ii) Patch Repairs Of Town Kalibari Maya Cinema Hall Road To Thana Road Via Babur Bazar (L 1.25 Km) Road
|
| Description |
Recarpeting And Patch Carpeting, Patch Wbm And Grouting, Works Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_52027_1 |
|
Reference Number |
42/EE/DD/PWD(RnB)/2024-25 |
| Tender Fee | 1000 |
| EMD | 48542 |
| Tender Value | - |
| Place | Dharmanagar |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=52902 |
| Start Date | August 31, 2024 23:30 |
| End Date |
Expired
07/09/2024
Expired 768 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of pwd roads i.e (i) dharmanagar thana (police station) to tsecl office via babur bazar (l0.45 km) ii.nayapara kalibari to vivekanada road at dharmanagar market via athletic club (l0.48 km) n iii fire service to post office near pwd
Potholes repair bituminous macadam premix carpeting and stone seal coat n road furniture n marking
Read moreUrgent fdr on photamati bazar to photamati kalibari road under killa pwd(randb) sub-division during the year 2024-25./ s.h protection work through cc blocks placing etc
Urgent fdr on photamati bazar to photamati kalibari road under killa pwd(randb) sub-division during the year 2024-25./ s.h protection work through cc blocks placing etc
Read moreFdr/ urgent repair of road from hezamara bazar to kalaghat ( l- 1.998 km) during the year 2024-25/ sh wbm-3, patch repair, carpeting, protection wall etc. complete.
Fdr/ urgent repair of road from hezamara bazar to kalaghat ( l- 1.998 km) during the year 2024-25/ sh wbm-3, patch repair, carpeting, protection wall etc. complete.
Read moreFdr/repairing of road from silachari bazar to ananda bandu para, (length-2.00km) during the year 2024-25 ,/sh-wbm,re-carpeting, sand seal coating,surface drains etc.
Fdr/repairing of road from silachari bazar to ananda bandu para, (length-2.00km) during the year 2024-25 ,/sh-wbm,re-carpeting, sand seal coating,surface drains etc.
Read moreFdr/maintenance of kma road ing from ambassa railway crossing road to kachucherra bazar(l-8.08km)/ sh - re-carpeting, seal coat, road side drain, and cc blocks etc.
Fdr/maintenance of kma road ing from ambassa railway crossing road to kachucherra bazar(l-8.08km)/ sh - re-carpeting, seal coat, road side drain, and cc blocks etc.
Read moreFdr of road from bhatifatikcherra main road to bhatifatilcherra shibir (l-2.30km.),narsingarh bazar to bhagalpur bop(l-1.50km) and nabagram school chowmuhani to narayanpur bazar(l-3.00km)/sh patch repairing,carpeting,seal coat,side berm dressing and
Fdr of road from bhatifatikcherra main road to bhatifatilcherra shibir (l-2.30km.),narsingarh bazar to bhagalpur bop(l-1.50km) and nabagram school chowmuhani to narayanpur bazar(l-3.00km)/sh patch repairing,carpeting,seal coat,side berm dressing and
Read moreFdr/mtc. of road from kalachara to bhuratali kalibari via sonamohan para (l-4.20 km) during the year 2024-25/sh- patch metalling, re-carpeting, and seat coat etc. (portion from 1.960 km to 3.300km) gr-i.
Fdr/mtc. of road from kalachara to bhuratali kalibari via sonamohan para (l-4.20 km) during the year 2024-25/sh- patch metalling, re-carpeting, and seat coat etc. (portion from 1.960 km to 3.300km) gr-i.
Read moreFdr/mtc of road from kalachara to bhuratali kalibari via sonamohan para (l-4.20 km) during the year 2024-25/sh-patch metalling, re-carpeting, seat coat and cd, wing wall etc. (portion from 3.300 km to 4.200km) gr-ii.
Fdr/mtc of road from kalachara to bhuratali kalibari via sonamohan para (l-4.20 km) during the year 2024-25/sh-patch metalling, re-carpeting, seat coat and cd, wing wall etc. (portion from 3.300 km to 4.200km) gr-ii.
Read moreFdr of road from maheshkhala bazar to das para (length_0 point 95 km) under dukli sub division during the year 2024_25_sh patch soling, wbm, carpeting, road side drain and other allied works
Fdr of road from maheshkhala bazar to das para (length_0 point 95 km) under dukli sub division during the year 2024_25_sh patch soling, wbm, carpeting, road side drain and other allied works
Read moreFdr construction of protection wall and road side drain from ranirbazar nit road to thanda kalibari road under jirania sub division pwd (r and b) during the year 2024 2025 sh protection work, rcc drain , wbm iii, carpeting, seal coat etc (2nd call)
Fdr construction of protection wall and road side drain from ranirbazar nit road to thanda kalibari road under jirania sub division pwd (r and b) during the year 2024 2025 sh protection work, rcc drain , wbm iii, carpeting, seal coat etc (2nd call)
Read moreof your Industry type