Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Leakage Rectification From The Bottom Cover Of H.P. 2nd Condenser 10 He 7 In Urea Iii Plant
|
Description |
Leakage Rectification From The Bottom Cover Of H.P. 2nd Condenser 10 He 7 In Urea Iii Plant
|
Organisation | Brahmaputra Valley Fertilizer Corporation Limited | Central Govt. Ministry/Department |
Tender Id | 2025_BVFCL_800252_1 |
Reference Number |
UB-III/25/Cont-361/9065 |
Tender Fee | 590 |
EMD | 5008 |
Tender Value | |
Place | BVFCL, Namrup |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1104897 |
Start Date | June 03, 2025 14:30 |
End Date |
18/06/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreProcurement of valve seat (indigenous) for j241 a and d pumps in urea plant
Procurement of valve seat (indigenous) for j241 a and d pumps in urea plant
Read moreProviding and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiii)
Read moreEngagement of contractor for removal and disposal of sludge from open and closed gutters sewerage drainage lines sewage treatment plant and septic tanks in seepz-sez premises and residential staff quarters
Engagement of contractor for removal and disposal of sludge from open and closed gutters sewerage drainage lines sewage treatment plant and septic tanks in seepz-sez premises and residential staff quarters
Read more4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreExecution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti
Execution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti
Read morePainting work in outside n inside face of cut and cover approach, railing of power house, trc, flared wall, intake structure,fencing panel from main gate to switch yard area and in switch yard area etc ic civil r and m work of qtrs at 3x20mw, mhps
Painting work in outside n inside face of cut and cover approach, railing of power house, trc, flared wall, intake structure,fencing panel from main gate to switch yard area and in switch yard area etc ic civil r and m work of qtrs at 3x20mw, mhps
Read moreof your Industry type