Tender Details

Particulars Details
Title
Leakage Rectification From The Bottom Cover Of H.P. 2nd Condenser 10 He 7 In Urea Iii Plant
Description
Leakage Rectification From The Bottom Cover Of H.P. 2nd Condenser 10 He 7 In Urea Iii Plant
Organisation Brahmaputra Valley Fertilizer Corporation Limited | Central Govt. Ministry/Department
Tender Id 2025_BVFCL_800252_1
Reference
Number
UB-III/25/Cont-361/9065
Tender Fee 590
EMD 5008
Tender Value
Place BVFCL, Namrup
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1104897
Start Date June 03, 2025 14:30
End Date

18/06/2025 ( Expired 18 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Procurement of valve seat (indigenous) for j241 a and d pumps in urea plant

Procurement of valve seat (indigenous) for j241 a and d pumps in urea plant

Read more
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.

Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.

Read more
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)

Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000

Read more
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india

World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiii)

Read more
Engagement of contractor for removal and disposal of sludge from open and closed gutters sewerage drainage lines sewage treatment plant and septic tanks in seepz-sez premises and residential staff quarters

Engagement of contractor for removal and disposal of sludge from open and closed gutters sewerage drainage lines sewage treatment plant and septic tanks in seepz-sez premises and residential staff quarters

Read more
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Read more
Execution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti

Execution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti

Read more
Painting work in outside n inside face of cut and cover approach, railing of power house, trc, flared wall, intake structure,fencing panel from main gate to switch yard area and in switch yard area etc ic civil r and m work of qtrs at 3x20mw, mhps

Painting work in outside n inside face of cut and cover approach, railing of power house, trc, flared wall, intake structure,fencing panel from main gate to switch yard area and in switch yard area etc ic civil r and m work of qtrs at 3x20mw, mhps