Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening With 3 Additional Lane Abetting Existing Two Lane Chhapra Bypass Section Of Nh 19 From Km.143.200 To Km.159.255 On Nh 19 (Total Length 16.055 Km) In The State Of Bihar
|
| Description |
Widening With 3 Additional Lane Abetting Existing Two Lane Chhapra Bypass Section Of Nh 19 From Km.143.200 To Km.159.255 On Nh 19 (Total Length 16.055 Km) In The State Of Bihar
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_171728_1 |
|
Reference Number |
- |
| Tender Fee | 40000 |
| EMD | 3.77 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=188096 |
| Start Date | October 21, 2023 14:30 |
| End Date |
Expired
06/02/2024
Expired 985 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authority engineer during operation and maintenance period of chhapra -hajipur section of nh-31 (old nh-19) from km.143.200 to km.209.940 in the state of bihar (total length km. 66.74).
Consultancy services for authority engineer during operation and maintenance period of chhapra -hajipur section of nh-31 (old nh-19) from km.143.200 to km.209.940 in the state of bihar (total length km. 66.74).
Read moreConstruction of service roads at anjanpeer in chhapra - hajipur section of nh-19 (new nh -31) in the state of bihar (3rd call).
Construction of service roads at anjanpeer in chhapra - hajipur section of nh-19 (new nh -31) in the state of bihar (3rd call).
Read moreWidening and strengthening of etawah-mainpuri (nh-83) to vicharpura (nh-19)-via kendriya vidyalaya in barpura block, district etawah
Widening and strengthening of etawah-mainpuri (nh-83) to vicharpura (nh-19)-via kendriya vidyalaya in barpura block, district etawah
Read moreConsultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreDevelopment of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.
Development of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreConstruction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Read moreConsultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).
Read moreof your Industry type