Tender Details

Particulars Details
Title
Erection Of Dg,Dismantling Existing Dg Panel,Rcc M20,Pcc 1 2 4 In Footing, Floors,Earth Excavation
Description
Organisation NA | Ministry of Petroleum and Natural Gas
Tender Id GEM/2025/B/5960906
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date February 17, 2025 18:59
End Date
Expired 27/02/2025

Expired 595 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 4 Lakhs Experience with Gov. Required: Years
Buyer Name: M Rajkumar
Ministry: Ministry Of Petroleum And Natural Gas
Department: Na
Organisation: Hindustan Petroleum Corporation Ltd
Similar Tenders
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick

Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick

Read more
Supplying, erection, testing and commissioning amf panel for existing 750 kva dg set at mbr sector-8, kamothe.

Supplying, erection, testing and commissioning amf panel for existing 750 kva dg set at mbr sector-8, kamothe.

Read more
Supply, erection, testing and commissioning of 250 kva dg set with amf control panel as per specification attached make- kirloskar, crompton greaves, cummins, honda, mahindra only.

Supply, erection, testing and commissioning of 250 kva dg set with amf control panel as per specification attached make- kirloskar, crompton greaves, cummins, honda, mahindra only.

Read more
Design, transportation and supply,providing foundation,erection,supply,installation,cabling and others,supply of ug cable,laying of ug cables,supply and laying,maintenance free earthing,installation of earthing,provision of fencing,making concrete cutting,earth excavation

Design, transportation and supply,providing foundation,erection,supply,installation,cabling and others,supply of ug cable,laying of ug cables,supply and laying,maintenance free earthing,installation of earthing,provision of fencing,making concrete cutting,earth excavation

Read more
Dd-2 dock pump - supply of mcc panel,dd-2 dock pump - dismantling of existing,main distribution panel with 630a mccb,installation and commissioning of newly,supply of sub-distribution panel with 31,installation and commissioning of newly su,supply of main distribution panel with 6,dismantling of existing old - vintage main,supply of main pdb with 630a mccb income,installation and commissioning of main pdb,supply of sub-distribution panel with 31,installation and commissioning of sub-dist,supply of power panels for bb shops,dismantling of existing old power panels,construction of earth pits with complete

Dd-2 dock pump - supply of mcc panel,dd-2 dock pump - dismantling of existing,main distribution panel with 630a mccb,installation and commissioning of newly,supply of sub-distribution panel with 31,installation and commissioning of newly su,supply of main distribution panel with 6,dismantling of existing old - vintage main,supply of main pdb with 630a mccb income,installation and commissioning of main pdb,supply of sub-distribution panel with 31,installation and commissioning of sub-dist,supply of power panels for bb shops,dismantling of existing old power panels,construction of earth pits with complete

Read more
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay

Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 6 sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supplying and fixing of medium class pvc conduit,supplying and fixing of spn db,replacement of 12v, stop solenoid,llop sensor,hct hwt sensor,sensor float,dismantling of the existing dg control panel,rerouting of the existing cable

Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 6 sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supplying and fixing of medium class pvc conduit,supplying and fixing of spn db,replacement of 12v, stop solenoid,llop sensor,hct hwt sensor,sensor float,dismantling of the existing dg control panel,rerouting of the existing cable

Read more
Click Here to Download Dockets
of your Industry type