Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of New Brackets And Rollers After Dismantling Existing Damaged Pieces Along With Strengthening Of Their Base For Unit 501 B Conveyor Belt At Moonidih Coal Washery.
|
| Description |
Installation Of New Brackets And Rollers After Dismantling Existing Damaged Pieces Along With Strengthening Of Their Base For Unit 501 B Conveyor Belt At Moonidih Coal Washery.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_342607_1 |
|
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2025-26/E 733 |
| Tender Fee | 0 |
| EMD | 9800 |
| Tender Value | - |
| Place | MOONIDIH WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355154 |
| Start Date | August 29, 2025 14:30 |
| End Date |
Expired
06/09/2025
Expired 404 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Read moreRepair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreMtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil
Read moreInstallation of new brackets and rollers after dismantling existing damaged pieces along with modification of their base for unit 403-b conveyor gallery at moonidih coal washery.
Installation of new brackets and rollers after dismantling existing damaged pieces along with modification of their base for unit 403-b conveyor gallery at moonidih coal washery.
Read moreInstallation of new brackets and rollers after dismantling existing damaged pieces along with modification of their base for unit 403-a conveyor gallery at moonidih coal washery.
Installation of new brackets and rollers after dismantling existing damaged pieces along with modification of their base for unit 403-a conveyor gallery at moonidih coal washery.
Read moreInstallation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Read moreInstallation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 401 and 402 belt conveyors at moonidih coal washery.
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 401 and 402 belt conveyors at moonidih coal washery.
Read moreInstallation of new brackets and rollers after dismantling existing damaged pieces along with modification of their base for unit 301-a and 301-b belt conveyors at moonidih coal washery.
Installation of new brackets and rollers after dismantling existing damaged pieces along with modification of their base for unit 301-a and 301-b belt conveyors at moonidih coal washery.
Read moreDismantling and changing/ repairing the damaged portion of conveyor structure, c/r bracket, roller, post and bracings for unit 501-a belt conveyor at moonidih coal washery.
Dismantling and changing/ repairing the damaged portion of conveyor structure, c/r bracket, roller, post and bracings for unit 501-a belt conveyor at moonidih coal washery.
Read moreof your Industry type