Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply At Vaghara Vaghari Tal Parola Dist Jalgaon
|
| Description |
Supply Of Sound System Material At Vaghara Vaghari Tal Parola Dist Jalgaon
|
| Organisation | RDD-CEO-JALGAON | State Govt. and UT |
| Tender Id | 2025_JALGA_1133469_1 |
|
Reference Number |
JLVP/Vaghara/E-T/02/24-25 |
| Tender Fee | 500 |
| EMD | 0 |
| Tender Value | - |
| Place | At Vaghara-Vaghari Tal Parola Dist Jalgaon |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1975705 |
| Start Date | January 04, 2025 14:30 |
| End Date |
Expired
11/01/2025
Expired 631 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSupply at titvi tal parola dist jalgaon.
Supply of materials for r. o. filter with atm m/c purification plant of discharge capacity 1000 lph at titvi tal parola dist jalgaon.
Read moreSupply at shirsode tal parola dist jalgaon
Supply of materials providing and erecting solar led street light on approach road from gayas mistri to guddu sheik house at shirsode tal parola dist jalgaon
Read moreSupply at waghra-waghri tal parola dist jalgaon
Supply of materials providing led street light on existing pole at waghra-waghri tal parola dist jalgaon
Read moreSupply at chikhalod kh tal parola dist jalgaon.
Supply of materials for r. o. filter with atm m/c purification plant of discharge capacity 1000 lph at chikhalod kh tal parola dist jalgaon.
Read moreConstruction of beautification gajanan colony at parola tal..parola dist. jalgaon
Construction of beautification gajanan colony at parola tal..parola dist. jalgaon
Read moreof your Industry type