Tender Details
Particulars | Details |
---|---|
Title |
Wbiw/Eeii/Ldcd/E Nit02/25 26 Sl1
|
Description |
Carrying Out Detailed Topographical And Hydrographical Survey Work Including Grain Size Analysis Of Soil For 15 Nos Khal Within Bagnan I,Ii, Shyampur I ,Ii Block Of Howrah District Under L.D.C Division For Dredging .
|
Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
Tender Id | 2025_IWD_833307_1 |
Reference Number |
WBIW/EEII/LDCD/eNIT02/2025-26 |
Tender Fee | 0 |
EMD | 29999 |
Tender Value | |
Place | Bagnan |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1856758 |
Start Date | April 07, 2025 23:00 |
End Date |
21/04/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carrying out the resistivity survey for locating the proper spot for drilling of tube well within the selected habitation, submission of report with resistivity readings in villages of block parasia and tamia under parasia division
Carrying out the resistivity survey for locating the proper spot for drilling of tube well within the selected habitation, submission of report with resistivity readings in villages of block parasia and tamia under parasia division
Read moreCarrying out the resistivity survey for locating the proper spot for drilling of tube well within the selected habitation, submission of report with resistivity readings in villages of block amarwada and harrai under parasia division
Carrying out the resistivity survey for locating the proper spot for drilling of tube well within the selected habitation, submission of report with resistivity readings in villages of block amarwada and harrai under parasia division
Read moreCarrying out the resistivity survey for locating the proper spot for drilling of tube well within the selected habitation, submission of report with resistivity readings in villages of block jamai under parasia division
Carrying out the resistivity survey for locating the proper spot for drilling of tube well within the selected habitation, submission of report with resistivity readings in villages of block jamai under parasia division
Read moreConstruction of 250 cum ohr including sub-soil investigation work with lds ,pump houses, boundary walls and providing functional household tap connection for keshuria(zone-i,ii) pipe w/s scheme within kharagpur block undermidnapore division.
Construction of 250 cum ohr including sub-soil investigation work with lds ,pump houses, boundary walls and providing functional household tap connection for keshuria(zone-i,ii) pipe w/s scheme within kharagpur block undermidnapore division.
Read moreWbiw/eeii/ldcd/enit02/25-26sl1
Carrying out detailed topographical and hydrographical survey work including grain size analysis of soil for 15 nos khal within bagnan-i,ii, shyampur-i ,ii block of howrah district under l.d.c division for dredging .
Read moreDistribution network for augmentation of rcfa part-ii piped water supply scheme including fhtc within command area of zone- 8 under jamuria block in the district of paschim bardhaman under rcfa division - i phe dte. (part- c)
Distribution network for augmentation of rcfa part-ii piped water supply scheme including fhtc within command area of zone- 8 under jamuria block in the district of paschim bardhaman under rcfa division - i phe dte. (part- c)
Read moreWbiw/se/wc-i/nit-4(e)/2024-25 sl-1
Re-excavation of chetua chandanapara khal length of 10.964 km from origin river rupnarayan at chandanpara upto outfall river damodar at gadaipur within block bagnan- ii, p.s. bagnan, district-howrah
Read moreWbiw/eeii/ldcd/enit16/24-25sl1
Re-excavation of new santoshpur khal (length 2.590 km) from origin (besides bagnan -shyampur road) upto two outfalls (river damodar and midnapore main canal) within gp - antila, block- bagnan- ii p.s bagnan, district howrah (ref ssm)
Read moreWbiw/sdo-i/enit-10/rri/24-25/1
Assessment of present cross sectional profile with topographical survey of baldeghata khal within gaighata block at north 24 parganas district under bidyadhari drainage division i nd w dte to be conducted by river research institute
Read moreConstruction of 250 cum ohr including sub-soil with lds ,pump houses, boundary walls and providing fhtc(1258 nos) including 02(two) years o and m for keshuria(zone-i,ii) pipe w/s scheme within kharagpur-i block under midnapore-divisionphe dte.
Construction of 250 cum ohr including sub-soil with lds ,pump houses, boundary walls and providing fhtc(1258 nos) including 02(two) years o and m for keshuria(zone-i,ii) pipe w/s scheme within kharagpur-i block under midnapore-divisionphe dte.
Read moreof your Industry type