Tender Details
Particulars | Details |
---|---|
Title |
Rectification/Modification Of Oltc Tap Position Increasing To / 10 Instead Of 5 15 High Voltage Winding Coils Ratio/Reconditioning Of 220/6.9 Kv, 25/31.5 Mva Power Transformer 12 At Kondapaka 220/6.9 Kv Substation Including Dismantling, Loading, Rectification At Workshop Transportation, Unloading, Erection, Testing And Commissioning Of 220/6.6 Kv, 25/31.5 Mva Power Transformer At Kondapaka 220/6.9 Kv Substation Under Electrical Sub Division Om Div.Xxi, Control Room.
|
Description |
Rectification Modification Of Oltc Tap Position Increasing To Plus Minus 10percent Instead Of Plus5percent Minus15percent High Voltage Winding Coils Ratio Reconditioning Of 220 6.9 Kv 25 31.5 Mva Power Transformer 1and 2 At Kondapaka 220 6.9 Kv Substation Including Dismantling Loading Rectification At Workshop Transportation Unloading Erection Testing And Commissioning Of 220 6.9 Kv 25 31.5 Mva Power Transformer At Kondapaka 220 6.9 Kv Substation Under Electrical Subdivision Oand M Div No Xxi Control Room
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 495480 |
Reference Number |
EP.No.93/CGM(E)/TC/T3/OM Div.XXI/2023-24 dt:06.02.2024 |
Tender Fee | 6170 |
EMD | 1.74 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | February 07, 2024 20:30 |
End Date |
14/02/2024 ( Expired 481 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling loading unloading transportation from takari lis st.2 to tembhu lis st.1a and erection testing and commissioning of 50 mva 220, 33 kv and 25 mva, 33,6.6 kv power transformer at tembhu lis st.1a at tembhu
Dismantling loading unloading transportation from takari lis st.2 to tembhu lis st.1a and erection testing and commissioning of 50 mva 220, 33 kv and 25 mva, 33,6.6 kv power transformer at tembhu lis st.1a at tembhu
Read moreRectification/modification of oltc tap position increasing to /- 10 instead of 5-15 high voltage winding coils ratio/reconditioning of 220/6.9kv, 25/31.5 mva power transformer- 12 at kondapaka 220/6.9kv substation including dismantling, loading, rectification at workshop transportation, unloading, erection, testing and commissioning of 220/6.6kv, 25/31.5 mva power transformer at kondapaka 220/6.9kv substation under electrical sub division om div.xxi, control room.
Rectification modification of oltc tap position increasing to plus minus 10percent instead of plus5percent minus15percent high voltage winding coils ratio reconditioning of 220 6.9kv 25 31.5 mva power transformer 1and 2 at kondapaka 220 6.9kv substation including dismantling loading rectification at workshop transportation unloading erection testing and commissioning of 220 6.9kv 25 31.5 mva power transformer at kondapaka 220 6.9kv substation under electrical subdivision oandm div no xxi control room
Read moreRectification/modification of oltc tap position increasing to /- 10 instead of 5/-15 high voltage winding coils ratio/reconditioning of 220/6.9kv, 25/31.5 mva power transformer- 12 at mallaram 220/6.9kv substation including dismantling, loading, rectification at work shop, transportation, unloading, erection, testing and commissioning of 220/6.9kv, 25/31.5 mva power transformer at mallaram 220/6.9kv substation under electrical sub division, om div.xxi, control room
Rectification/modification of oltc tap position increasing to /- 10 instead of 5/-15 high voltage winding coils ratio/reconditioning of 220/6.9kv,25/31.5 mva power transformer-1 2 at mallaram 220/6.9kv substation including dismantling, loading, rectification at workshop, transportation, unloading,erection, testing and commissioning of 220/6.9kv, 25/31.5 mva power transformer at mallaram 220/6.9kv substation under electrical subdivision, om div.no.xxi, control room
Read moreCapacity addition of 25 mva power transformer at missiontilla by transshipment of the said transformer from banduar 132 kv sub-station to missiontilla 132 kv substation in/c loading, unloading, dragging, testing, filtration required dismantlin
Capacity addition of 25 mva power transformer at missiontilla by transshipment of the said transformer from banduar 132 kv sub-station to missiontilla 132 kv substation in/c loading, unloading, dragging, testing, filtration required dismantlin
Read moreof your Industry type