Tender Details

Particulars Details
Title
Checking empty wagons fixing the door, cleaning of railway track, overflow of coal, segregation of noncoal substances at the loading point, and spraying water along the siding for suppression of dust, etc. at bankola no 2 at shyamsundarpur colliery.
Description
Checking empty wagons fixing the door, cleaning of railway track, overflow of coal, segregation of noncoal substances at the loading point, and spraying water along the siding for suppression of dust, etc. at bankola no 2 at shyamsundarpur colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_316241_1
Reference
Number
ECL/GM/BA/E TENDER/24-25/Min/71 Dt 29.08.2024
Tender Fee 0
EMD 19700
Tender Value
Place Shyamsundarpur Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327730
End Date

09/09/2024 ( Expired 10 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Checking empty wagons fixing the door, cleaning of railway track, overflow of coal, segregation of noncoal substances at the loading point, and spraying water along the siding for suppression of dust, etc. at bankola no 2 at shyamsundarpur colliery.

Checking empty wagons fixing the door, cleaning of railway track, overflow of coal, segregation of noncoal substances at the loading point, and spraying water along the siding for suppression of dust, etc. at bankola no 2 at shyamsundarpur colliery.

Read more
Labour charges for grouting of poles and fixing of fencing along railway siding from line-4 loading point to vpr-mipl camp at kchp in manuguru area, bhadradri kothagudem(dt), t.g.

Labour charges for grouting of poles and fixing of fencing along railway siding from line-4 loading point to vpr-mipl camp at kchp in manuguru area, bhadradri kothagudem(dt), t.g.

Read more
Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl.

Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl.

Read more
Installation and commissioning of 1 no 1200 mm width x 180 meter length belt conveyor at 4wd and 16wl of rvii seam to 7wd and 19l of rviia seam drift belt of shyamsundarpur colliery under bankola area.(retender)

Installation and commissioning of 1 no 1200 mm width x 180 meter length belt conveyor at 4wd and 16wl of rvii seam to 7wd and 19l of rviia seam drift belt of shyamsundarpur colliery under bankola area.(retender)

Read more
Cleaning/desilting of drain both side of railway track from bazarpura to weigh bridge no. 03 railway siding at nowrozabad sub area of johilla area

Cleaning/desilting of drain both side of railway track from bazarpura to weigh bridge no. 03 railway siding at nowrozabad sub area of johilla area

Read more
Day to day spillage coal cleaning from tail end and transfer point and loading point from along the belt in ug of umaria colliery, umaria sub area of johilla area

Day to day spillage coal cleaning from tail end and transfer point and loading point from along the belt in ug of umaria colliery, umaria sub area of johilla area

Read more
Pcc work along floor of rviiit2 seam above sub panel s12a of panel s12 at shyamsundarpur colliery

Pcc work along floor of rviiit2 seam above sub panel s12a of panel s12 at shyamsundarpur colliery

Read more
Regular cleaning and upkeeping of 02 nos weighbridges including platform and 02 nos challan point along coal corridor road at hingula ocp under ha. (for a period of 240 days)

Regular cleaning and upkeeping of 02 nos weighbridges including platform and 02 nos challan point along coal corridor road at hingula ocp under ha. (for a period of 240 days)

Read more
Annual cleaning and sweeping of coal sampling storage room, laboratory room and peripheral area at railway siding no. 09 and chp office, sub-station and challan room of chp at balram ocp under hingula area. (for a period of 730 days)

Annual cleaning and sweeping of coal sampling storage room, laboratory room and peripheral area at railway siding no. 09 and chp office, sub-station and challan room of chp at balram ocp under hingula area. (for a period of 730 days)

Read more

No attachments found

Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise