Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Steam Supply And Condensate Recovery Manifolds
|
| Description |
Design, Engineering Manufacturing, Procurement Of Materials, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Steam Supply And Condensate Recovery Manifolds
|
| Organisation | IndianOil Corporation Limited(IOCL) |
| Tender Id | 2023_REFHQ_166155_1 |
|
Reference Number |
TP/077154C001/000/1392-101/247 |
| Tender Fee | - |
| EMD | 0 |
| Tender Value | - |
| Place | Online at PMCs Office |
| Link |
View Original Tender Notice
https://iocletenders.nic.in |
| Start Date | May 25, 2023 20:30 |
| End Date |
Expired
29/06/2023
Expired 1208 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for pipe connectivity line work for lp and hp condensate line form generation point to condensate recovery system
Pipe connectivity line work for lp and hp condensate line form generation point to condensate recovery system
Read moreExpression of interest for enlistment of heat recovery steam generator (hrsg) (item category-06be)
Expression of interest for enlistment of heat recovery steam generator (hrsg) (item category-06be)
Read moreTtps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Read moreSulphonated naphthalene formaldehyde condensate (snfc)
Sulphonated naphthalene formaldehyde condensate (snfc)
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreCondensate recovery pump (40 nb) model,condensate flash vessel with accessories (150nb),spring - loaded disc check valve - metal to metal seating (50nb),glandless piston valve, end’ s flanged# 150 moc: cs model: 050psval (50nb),single orifice float trap, end’ s scrd bspt (20nb)
Condensate recovery pump (40 nb) model,condensate flash vessel with accessories (150nb),spring - loaded disc check valve - metal to metal seating (50nb),glandless piston valve, end’ s flanged# 150 moc: cs model: 050psval (50nb),single orifice float trap, end’ s scrd bspt (20nb)
Read moreTtps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul
Read moreMtpsi tm unit ii annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines in unit ii during annual overhauling 2026 27
Mtpsi tm unit ii annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines in unit ii during annual overhauling 2026 27
Read moreof your Industry type