Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Of Both Id Fan 1 A And 1 B During Unit 1 Overhauling Scheduled To Be Held In September 2025 2 X300 Mw Sgtpp
|
| Description |
Overhauling Of Both Id Fan 1 A And 1 B During Unit 1 Overhauling Scheduled To Be Held In September 2025 2 X300 Mw Sgtpp
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_799628_1 |
|
Reference Number |
WBPDCL/SGTPP/NIT/E3225/24-25 |
| Tender Fee | 0 |
| EMD | 21278 |
| Tender Value | - |
| Place | Adbuilding SGTPP P.O Manigram Dist Murshidabad |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1774936 |
| Start Date | January 21, 2025 15:30 |
| End Date |
Expired
12/02/2025
Expired 611 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Procurement of fasteners for overhauling job of coal mill, aph ducts, coal burner nozzle, ccp, pa/fd/id fan of stage-1 (2x300 mw), sgtpp
Read moreEngine overhauling gasket complete,valve inlet and exhaust,valve oil,valve guide,valve seat inlet and exhaust,valve cutter lock,head bolt 10 no,main bearing,big end bearing,thrust washer,piston with piston pin and lock complete,cylinder sleeve,inlet and exhaust rocker spring,cam shaft cap bolt 10 no,sump bolt 10 no,throttle body complete assy with sensor,exhaust manifold stud with nut,piston ring set,timing belt,front timing cover,front timing cover bolt,cooling fan stud with nut 10 no,fuel pipe with clamp big and small,oil pump,inlet manifold stud with nut 12 no,tappet cover bolt 10 no,timing tensioner,water pump bolt 10 no,flywheel with ring,pilot bearing,oil dipstick o ring,radiator hose pipe with clamp,prv valve,suspension bush kit complete,front shock absorber,front and rear shackle pin nut with bush,front brake disc pad both side,front tube oil seal both side,front king pin shim,king pin bolt 12 no,knuckle oil seal bolt 10 no,rear wheel cylinder left side,rear hub bearing and cone both side,rear wheel t
Engine overhauling gasket complete,valve inlet and exhaust,valve oil,valve guide,valve seat inlet and exhaust,valve cutter lock,head bolt 10 no,main bearing,big end bearing,thrust washer,piston with piston pin and lock complete,cylinder sleeve,inlet and exhaust rocker spring,cam shaft cap bolt 10 no,sump bolt 10 no,throttle body complete assy with sensor,exhaust manifold stud with nut,piston ring set,timing belt,front timing cover,front timing cover bolt,cooling fan stud with nut 10 no,fuel pipe with clamp big and small,oil pump,inlet manifold stud with nut 12 no,tappet cover bolt 10 no,timing tensioner,water pump bolt 10 no,flywheel with ring,pilot bearing,oil dipstick o ring,radiator hose pipe with clamp,prv valve,suspension bush kit complete,front shock absorber,front and rear shackle pin nut with bush,front brake disc pad both side,front tube oil seal both side,front king pin shim,king pin bolt 12 no,knuckle oil seal bolt 10 no,rear wheel cylinder left side,rear hub bearing and cone both side,rear wheel t
Read moreOverhauling of pa fan 1a and 1b and fd fan 1a and 1b during unit 1 overhauling scheduled to be held in august 2025 2x300mw sgtpp
Overhauling of pa fan 1a and 1b and fd fan 1a and 1b during unit 1 overhauling scheduled to be held in august 2025 2x300mw sgtpp
Read moreService contract for overhauling annual maintenance of pa fan (1a and 1b) and fd fan (1a and 1b) during unit 1 overhauling scheduled to be held in august 2025, (2x300mw), sgtpp.
Service contract for overhauling / annual maintenance of pa fan (1a and 1b) and fd fan (1a and 1b) during unit 1 overhauling scheduled to be held in august 2025, (2x300mw), sgtpp.
Read moreOverhauling of both pa fan 2a and 2b and both fd fan 2a and 2b during unit 2 overhauling scheduled to be held in july 2024 sgtpp
Overhauling of both pa fan 2a and 2b and both fd fan 2a and 2b during unit 2 overhauling scheduled to be held in july 2024 sgtpp
Read moreOverhauling of both id fan 2a and 2b during unit 2 overhauling scheduled to be held in july 2024 sgtpp
Overhauling of both id fan 2a and 2b during unit 2 overhauling scheduled to be held in july 2024 sgtpp
Read moreOverhauling of air pre heater 1a 1b of unit 1 to be held on august 202
Overhauling of air pre heater 1a 1b of unit 1 to be held on august 2025
Read moreOverhauling of air pre heater 1a and 1b of unit 1 to be held on august 2025
Overhauling of air pre heater 1a and 1b of unit 1 to be held on august 2025
Read moreOverhauling of both pa fan 2a and 2b and both fd fan 2a and 2bduring unit2 overhauling scheduled to be held in july 2024
Overhauling of both pa fan 2a and 2b and both fd fan 2a and 2bduring unit2 overhauling scheduled to be held in july 2024
Read moreOverhauling of crusher-1a and crusher-1b at stage-1, chp, btps
Overhauling of crusher-1a and crusher-1b at stage-1, chp, btps
Read moreof your Industry type