Tender Details
Particulars | Details |
---|---|
Title |
1. Ctr (P) Mg With 52 Kg/90 Uts Rail, (Ordinary Second Hand) Rail &Amp New Mg Psc Sleeper (M7) Density With Deep Screening &Amp Providing Ballast To Increase Ballast Cushion By 150 Mm Under
(I) Sse/Pw/Nnp Km = (95/0 101.10, 101.70 103.10 &Amp 103.3 118.5 ) = 22.70 Km
(Ii) Sse/Pw/Tqn Km = (221.4 237.0) = 15.60 Km
2. Ttr Mg Section In Several Yards On Main Line Under
(I) Sse/Pw/Nnp: 1:12=10 Set, Total = 10 Set
(Ii) Sse/Pw/Tqn: 1:12=17 And 1:8.5 = 07 , Total = 24 Set
(I
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75199091 |
Reference Number |
NER-LJN-2024-92 |
Tender Fee | 0 |
EMD | 20.37 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75199091/viewNitPdf_4576303.pdf |
Start Date | June 11, 2024 23:14 |
End Date |
04/07/2024 ( Expired 314 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bangalore -jolarpettai section: sw-i: ttr of existing 52kg curved switch and cms crossings (d mark) with 52kg curved switch, cms and fsl at yards of tyakal-4nos, bangarpet-4nos, varadapura-1no and bisanattam-1no - total 10sets in sse/p.way/bangarpet section. sw-ii: ttr of existing 52kg curved switch and cms crossings (d mark) with 52kg curved switch and cms crossings - 10nos 1 in 8.5 in sse/p.way/whitefield section. (mlo-2nos, dkn-4nos, sgt-2nos, kjm/dsl-1no, kjm-1no). sw-iii: ttr of existi
For complete deion and other details, please refer to tender
Read moreNanded division - (i) ctr(s) of exg 52kg(sh) rails on psc5(sh) sleepers 1540 nos/km density with new 60kg r260 grade rails (lwr) on wider psc(new) sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 300 mm and deep screening of ballast for a total length of 44.703 km (manmad - mudkhed section - 32.328 km. & akola - purna section - 12.375 km) and (ii) manmad - mudkhed section- trr(s) of exg. 52kg(sh) rails on psc5(sh) sleepers m7 density with 52kg(sh) rails (lw
For complete deion and other details, please refer to tender
Read moreConstruction of 12 unit std. type-ii quarter (phase-i) in c/w construction of 172 nos. type-ii qtrs in replacement of type-i qtrs block no.256/10, 262/12, 263/12, 264/13, 265/12, 266/12, 267/13, 273/6, 274/10, 275/10, 276/11, 278/10, 279/10, 280/10, 281/10, 282/10, 402/1, & total=172 units in old rly colony ambala cantt in the section of sse/w/e//umb.
For complete deion and other details, please refer to tender
Read more(a) bg trr (p) of the existing 60 kg rail by 60 kg/90 uts rail on psc-6 sleeper from km 144.30 to 145.10 (up line), from km 149.20 to 152.40, 156.70 to 157.40, 157.60 to 158.40, 158.70 to 159.10, 162.60 to 164.70, 165.10 to 165.90, 166.00 to 167.00 (dn line) between hwr-kdpr section under the jurisdiction of sr. den/i/kir. (total = 9.80 km) (b) bg ttr(p) of the existing 60kg rail 1 in 12 (fs) by 60 kg 1 in 12 (tws) pt. no. 104, 110, 109, 103, 105, 101 at kmrj yard, pt. no. 122 at eki under the
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreUdn-usd section: supply of 50-mm-size machine crushed stone ballast and loading into railway hoppers/wagons at usd mega depot (total quantity = 89900 cum) in connection with sanctioned work (i) udhna - jalgaon - tbr(points &crossings 1 in 12) - 70 sets (ii) ukai songadh - jalgaon (dn) - tbr - 43.534 km (iii) udhna - ukai songadh - ctr(s-p) - 2.509tkm
For complete deion and other details, please refer to tender
Read more1. ctr (p) mg with 52kg/90 uts rail, (ordinary second hand) rail & new mg psc sleeper (m7) density with deep screening & providing ballast to increase ballast cushion by 150 mm under- (i) sse/pw/nnp km = (95/0-101.10, 101.70 - 103.10 & 103.3 - 118.5 ) = 22.70 km (ii) sse/pw/tqn km = (221.4 - 237.0) = 15.60 km 2. ttr mg section in several yards on main line under- (i) sse/pw/nnp:- 1:12=10 set, total = 10 set (ii) sse/pw/tqn:- 1:12=17 and 1:8.5 = 07 , total = 24 set (i
For complete deion and other details, please refer to tender
Read moreName of the work : - dmm-gy, dmm-pak & kpd-tpty-ru sections:- sw-i: ctr(s) of exg. 52kg rails on psc sleepers 1310/1540 nos/km density with 60kg(sh) rails (lwr) on new wider psc sleepers (t-8746) 1540 nos./km including recoupment and increasing of ballast cushion to 250 mm along with deep screening of ballast for a length of 4.566 kms. sw-ii: trr(s)-through rail renewal (secondary) of exg. 52kg rails on psc sleepers m7 density with 60kg(sh) rails (lwr) for a length of 5.941 kms. sw-iii
For complete deion and other details, please refer to tender
Read moreName of the work : - dmm-gy, dmm-pak & kpd-tpty-ru sections:- sw-i: ctr(s) of exg. 52kg rails on psc sleepers 1310/1540 nos/km density with 60kg(sh) rails (lwr) on new wider psc sleepers (t-8746) 1540 nos./km including recoupment and increasing of ballast cushion to 250 mm along with deep screening of ballast for a length of 4.566 kms. sw-ii: trr(s)-through rail renewal (secondary) of exg. 52kg rails on psc sleepers m7 density with 60kg(sh) rails (lwr) for a length of 5.941 kms. sw-iii
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreof your Industry type