Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
T.N. 004/Osd/Br Iv/24 25
|
| Description |
Construction Of Cement Concrete Road Along Amritalal Pyne Lane Ward 27.
|
| Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
| Tender Id | 2024_MAD_771197_2 |
|
Reference Number |
E-Tender-004/OSD/Br-IV/24-25 |
| Tender Fee | 2000 |
| EMD | 17926 |
| Tender Value | |
| Place | HOWRAH |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1707631 |
| Start Date | November 20, 2024 23:30 |
| End Date |
Expired
27/11/2024
Expired 600 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreT.n.-001/osd/b-iv/24-25
Construction of cement concrete road along amritalal pyne lane ward 27.
Read moreKmc/ee(c)/br-xvi/ 125/005/25-26
Maint. of cement concrete road at amritalal mukherjee road near pre. no- 253 and others in ward no-125.
Read moreKmc/e.e(c )/br-xvi/ 125/025/25-26/uttaran
Imp. of cement concrete road at slum area of jaigirghat road bye lane near pre. no. b-3 , amritalal mukharjee road bye lane near pre. no. 658 and others in ward no-125
Read moreWbmad/bm/pwd/nit- 131(esf)/2025-26/sl-11
Construction of concrete road from 49 amritalal dawn road to 33 pat bari lane and near 359/2 mnk road (n) , ward no - 30, baranagar municipality
Read moreKmc/ee(c)/br-v/048/11/23-24
Restoration of ips passage due to w/s work from 12/1 surendralal pyne lane to 4/1 surendralal pyne lane in ward no-048
Read moreof your Industry type