Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Set Of Long Size Ruled Hard Bound Register
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106429246 |
|
Reference Number |
65245545 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106429246/viewNitPdf_4666337.pdf |
| Start Date | August 02, 2024 17:31 |
| End Date |
Expired
19/08/2024
Expired 784 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of ci earth pipes 80mm 2 54 mtrs long
Procurement of ci earth pipes 80mm 2 54 mtrs long
Read moreProcurement of 900mm long lay flat flex tube w sushook for use at gdk-11 incline, rg-1 area
Procurement of 900mm long lay flat flex tube w sushook for use at gdk-11 incline, rg-1 area
Read moreLong term output & performance based road assets maintenance works under package 41b/ oprmc-iii/ new capital road division, patna.
Long term output & performance based road assets maintenance works under package 41b/ oprmc-iii/ new capital road division, patna.
Read moreRoad repair work from prakash ji's house to pramod ji's house in ward no. 04, jhiliya jyoti nagar, and construction of a slab over the drain (approximately 40 feet long) in front of pramod ji's house.
Road repair work from prakash ji's house to pramod ji's house in ward no. 04, jhiliya jyoti nagar, and construction of a slab over the drain (approximately 40 feet long) in front of pramod ji's house.
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreConstruction work involving a drain from achhe lal patel's house to the main road in village sekhauna math tola (ward no. 45, bettiah municipal corporation); a boundary wall (approximately 64 feet long) for the pipra chowk graveyard; and new drains and paver block paving in the stretch from jagan manjhi's house to the old drain and from kishori manjhi's house to the old drain in pipra musahari tola.
Construction work involving a drain from achhe lal patel's house to the main road in village sekhauna math tola (ward no. 45, bettiah municipal corporation); a boundary wall (approximately 64 feet long) for the pipra chowk graveyard; and new drains and paver block paving in the stretch from jagan manjhi's house to the old drain and from kishori manjhi's house to the old drain in pipra musahari tola.
Read moreof your Industry type