Tender Details

Particulars Details
Title
Providing And Laying Hume Pipe For Temporary Restoration Of Saspotse And Yangthang Nallah Crossing
Description
Providing And Laying Hume Pipe For Temporary Restoration Of Saspotse And Yangthang Nallah Crossing
Organisation National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department
Tender Id 2026_LRRDA_147477_2
Reference
Number
EE/PMGSY/Leh/e tender/2026-27/DB//72-78
Tender Fee 1000
EMD 13470
Tender Value -
Place leh
Link
View Original Tender Notice

https://pmgsytendersla.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=230648

Start Date May 21, 2026 23:30
End Date
Expired 28/05/2026

Expired 141 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration of rain damages on mla crossing to tawi more road km. 0/00 to 1/630

Providing and laying tack coat, bitumen penetration macadam and 25 mm thick bituminous concrete for patch work in between km. 0/00 to 1/630).

Read more
Temporary restoration of road from jahalda to haripur via amarda under datan ii panchayat samity in the paschim medinipur district length 10.43 km

Temporary restoration of road from jahalda to haripur via amarda under datan ii panchayat samity in the paschim medinipur district length 10.43 km

Read more
Laying of cement concrete coping over existing crate tops and exposed offsets including restoration/repair of damaged crates on sonman nallah u/s bridge at rd 14420 m.

Laying of cement concrete coping over existing crate tops and exposed offsets including restoration/repair of damaged crates on sonman nallah u/s bridge at rd 14420 m.

Read more
Custom bid for services - 9030c26d99 modification and restoration of existing piping system for temporary bypass of vgo-hdt breech lock exchanger tag no 2093-e-02a at gujarat refinery

Custom bid for services - 9030c26d99 modification and restoration of existing piping system for temporary bypass of vgo-hdt breech lock exchanger tag no 2093-e-02a at gujarat refinery

Read more
(ndf/2026/43) restoration of rain damages to wss bardana banwar in tehsil dharampur distt. mandi hp (sh. c/o intake chamber and retaining wall for protection of intake in nallah side)

(ndf/2026/43) restoration of rain damages to wss bardana banwar in tehsil dharampur distt. mandi hp (sh. c/o intake chamber and retaining wall for protection of intake in nallah side)

Read more
Restoration rain damages on khanotiyon to bassali road km 0/0 to 13/0 (sh c/o 900mm dia hume pipe culvert along with both side wing walls at rd 1/500 and 1/600) under pdna 2025

Restoration rain damages on khanotiyon to bassali road km 0/0 to 13/0 (sh c/o 900mm dia hume pipe culvert along with both side wing walls at rd 1/500 and 1/600) under pdna 2025

Read more
Partial pipe replacement and emergent leak repairing including temporary road restoration of 450mm dia at 6 nos. nabin pally ward no.22 and nilgunj road at 9 no nabin pally ward no.22 at green park junction of nilgunge road w-22,24 no old nimta

Partial pipe replacement and emergent leak repairing including temporary road restoration of 450mm dia at 6 nos. nabin pally ward no.22 and nilgunj road at 9 no nabin pally ward no.22 at green park junction of nilgunge road w-22,24 no old nimta

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Repair restoration of yangthang zamindari khul.

Repair restoration of yangthang zamindari khul.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise