Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Installation Of Chair Type Benches In Town Park Sector 19 Rewari
|
| Description |
Providing And Installation Of Chair Type Benches In Town Park Sector 19 Rewari
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2025_HBC_458281_1 |
|
Reference Number |
HSVPGGMHORT/018/2025-2026 (Re Invited) |
| Tender Fee | 1430 |
| EMD | 4000 |
| Tender Value | |
| Place | Gurgaon |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=536006 |
| Start Date | July 14, 2025 14:30 |
| End Date |
Expired
19/07/2025
Expired 367 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreDesign, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreProviding and fitting of wood works, electrical works and other works for operators room at sccr kupwara.
Providing and fitting of wood works, electrical works and other works for operators room at sccr kupwara.
Read moreCuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation
Cuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation &#x0d
Read moreAnnual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreof your Industry type