Tender Details

About Tender

🏭 Invitation For Bids: 3 Lpe Coated Carbon Steel Underground Pipeline Construction 🛢️ Bharat Petroleum Corporation Limited (Bpcl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Laying And Construction Of A 3 Lpe Coated Carbon Steel Underground Pipeline Along With Associated Works For The Cgd Project In Amethi Pratapgarh Raebareli, Uttar Pradesh. 📅 Bid Submission Deadline: April 9, 2024, 2:00 Pm A Tender Security Amount Of Inr 10,00,000/ Is Required. No Tender Fee Is Payable. Interested Bidders Must Submit Detailed Proposals, Including Technical Capabilities, Experience, And Financial Bids, As Per The Tender Document Specifications. Keywords: Bharat Petroleum Corporation Limited, Underground Pipeline Construction, Cgd Project, Amethi Pratapgarh Raebareli, Uttar Pradesh, Tender, Bid Submission, Emd
Particulars Details
Title
Laying And Construction Of 3 Lpe Coated Carbon Steel Underground Pipeline And Associated Works For Cgd Project At Amethi Pratapgarh Raebareli Ga In The State Of Uttar Pradesh
Description
Laying And Construction Of 3 Lpe Coated Carbon Steel Underground Pipeline And Associated Works For Cgd Project At Amethi Pratapgarh Raebareli Ga In The State Of Uttar Pradesh
Organisation Bharat Petroleum Corporation Limited | Public Sector Undertakings
Tender Id 2024_BPCL_15945
Reference
Number
1000416041
Tender Fee 0
EMD 10 Lakh
Tender Value
Place As per Tender Document
Link https://bpcltenders.eproc.in
Start Date March 23, 2024 00:30
End Date

09/04/2024 ( Expired 427 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Design and construction of &#x0d property development buildings in land parcels at existing mandaveli bus &#x0d depot and terminus including civil, architectural finishes, plumbing, e and m, &#x0d hvac, lifts and all associated works

Read more
Design and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot

Design and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot

Read more
Development of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode

Development of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode

Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode

Read more
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Read more
Work for construction of cwr, pump machinery and laying jointing of pipeline in aanwali, rojhari and nayagaon,under city div. ist kota , district kota.

Work for construction of cwr, pump machinery and laying jointing of pipeline in aanwali, rojhari and nayagaon,under city div. ist kota , district kota.

Read more
Supply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam

Supply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam

Read more
Bid for provision of dark fibre (ofc) overhead/underground 12 core optical fiber laying at different vvip/vip ob spots including idc and rdc in delhi / ncr and outside on rate contract

Bid for provision of dark fibre (ofc) overhead/underground 12 core optical fiber laying at different vvip/vip ob spots including idc and rdc in delhi / ncr and outside on rate contract

Read more
Work of m and r of motor starter and pumps as well as round o clock operation of tube wells at new colony and tower for two years in harduaganj thermal power station uprvunl, kasimpur, aligarh, uttar pradesh

Work of m and r of motor starter and pumps as well as round o clock operation of tube wells at new colony and tower for two years in harduaganj thermal power station uprvunl, kasimpur, aligarh, uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise