Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bangalore Mysore Section: Construction Of Rrm Drain And Ballast Retaining Wall 1000m In Connection With The Work Of Complete Track Renewal (Ctr(p)) Of Existing 52kg Rails With 60kg For A Length Of 28.30kms From 13/500 30/000 And 31/800 43/600 Up Line In Sse/P.Way/Kgi Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78339156 |
|
Reference Number |
27SBC24of12-11-24Item-15 |
| Tender Fee | 0 |
| EMD | 3.93 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78339156/viewNitPdf_4766543.pdf |
| Start Date | November 13, 2024 18:15 |
| End Date |
Expired
09/12/2024
Expired 671 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bangalore - mysore section: complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kengeri section.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : re-profiling and protection of slope by providing turfing at km 39/100-41/400. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSw i : yesvantpur : improvements to pit lines including through rail renewal (secondary) of existing 52kg/90r rails with 52kg/90 uts for a length of 1.185km on pit line 1 and 2. sw ii : yesvantpur : improvements to pit lines including through rail renewal (secondary) of existing 52kg/90r rails with 52kg/90 uts for a length of 1.135km on pit line 3 and 4. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreYelahanka - chintamani section: cess repair and widening of formation of isolated locations for a length of 13.55 km from 1/600 to 75/200 (sl) in sse/pway/ynk section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read morePlucking of coconut from block i for a period of one year from the date of sanction or signing contract agreement whichever is later
As per rfp
Read morePlucking of coconut from block ii for a period of one year from the date of sanction or signing contract agreement whichever is later
As per rfp
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBengaluru division : replacement of steel girder for bridge no. 422 at km 0/800-900 (b-line and shunting neck) between bengaluru (sbc) - yesvanthpur (ypr) section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : construction of rub (rcc box size : 1 x 7.50 x 4.50m) at km 14/300-400 at nelamangala (nmga station) by rolling in / launching method. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type