Tender Details
Particulars | Details |
---|---|
Title |
Insulator And Rusty Cantilever Replacement Work At Gandhidham Samakhiyali Section &Amp Cantilever Replacement In Ahmedabad Area And Ohe Modification In Connection With Rob At Lc 235, Km 793/1 2 Of Gandhidham Samakhiyali Section
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73497145 |
Reference Number |
TRD-ADI-T-12-2023-24 |
Tender Fee | 0 |
EMD | 2.44 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73497145/viewNitPdf_4476472.pdf |
Start Date | February 21, 2024 23:00 |
End Date |
21/03/2024 ( Expired 419 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRepairing seepage by replacement of damaged pipeline with waterproofing work in the toilet area, repair painting works of internal area including all rooms, common area, dining, kitchen and external repair painting works of rosaline hostel (1 and 2)
Repairing seepage by replacement of damaged pipeline with waterproofing work in the toilet area, repair painting works of internal area including all rooms, common area, dining, kitchen and external repair painting works of rosaline hostel (1 and 2)
Read moreElectrification work of (g plus 1 with c.i shed at second floor) community hall at kamarpara in between ward no- o2 and o8 under english bazar municipality, malda.
Electrification work of (g plus 1 with&#x0d c.i shed at second floor)&#x0d community hall at kamarpara in&#x0d between ward no- o2 and o8 under&#x0d english bazar municipality, malda.
Read more1. name of work operation and maintenance of various ptus/ctus in ndmc area under swachhta division. sh providing and laying new pipeline for water connection in toilet at aiims near gate no.01 new delhi
1. name of work operation and maintenance of various ptus/ctus in ndmc area under swachhta division. sh providing and laying new pipeline for water connection in toilet at aiims near gate no.01 new delhi
Read moreConstruction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Construction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Read moreMaintenance work at risk and cost of epc contractor for obedullaganj to itarsi section of nh69 form km 2.800 to km 8.300 and from km 20.700 to km 63.000 design length 46.3 km excluding km 8.300 to km 20.700 wild life area in the state of mp
Maintenance work at risk and cost of epc contractor for obedullaganj to itarsi section of nh69 form km 2.800 to km 8.300 and from km 20.700 to km 63.000 design length 46.3 km excluding km 8.300 to km 20.700 wild life area in the state of mp
Read moreConst. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi gali-2 (anandi charan nayak side house) in connection with s/s, under watco section ggp colony, bbsr
Const. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi gali-2 (anandi charan nayak side house) in connection with s/s, under watco section ggp colony, bbsr
Read moreof your Industry type