Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Insulator And Rusty Cantilever Replacement Work At Gandhidham Samakhiyali Section &Amp Cantilever Replacement In Ahmedabad Area And Ohe Modification In Connection With Rob At Lc 235, Km 793/1 2 Of Gandhidham Samakhiyali Section
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73497145 |
Reference Number |
TRD-ADI-T-12-2023-24 |
Tender Fee | 0 |
EMD | 2.44 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73497145/viewNitPdf_4476472.pdf |
Start Date | February 21, 2024 23:00 |
End Date |
21/03/2024 ( Expired 471 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair, cleaning of sewage line, manhole, septic tank and allied work in np, sp area, officer mess, snco mess, billets, airmen no.1-2, shivdev hall under age br-i of ge (af) adm area at af station agra.
Repair, cleaning of sewage line, manhole, septic tank and allied work in np, sp area, officer mess, snco mess, billets, airmen no.1-2, shivdev hall under age br-i of ge (af) adm area at af station agra.
Read moreConstruction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)
Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect&#x0d phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)&#x0d
Read moreConstruction of rob in lieu of existing lc.no.2 at railway km.1034-1035 between pattabiram and pattabiram west railway station at km.67/4 of thirupathi renigunda thiruthani chennai road (nh.205) (balance work)
Construction of rob in lieu of existing lc.no.2 at railway km.1034 1035 between pattabiram and pattabiram west railway station at km.67/4 of thirupathi renigunda thiruthani chennai road (nh.205) (balance work)
Read moreProvision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-6 part-2 in ward no-1 of bmc, bbsr
Provision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-6 part-2 in ward no-1 of bmc, bbsr
Read moreConstruction of 2 lane rob in lieu of lc 114 at ir km 153/7-8 (on sh-11) samdari-raniwara-bhildi section in district jalore epc mode
Construction of 2 lane rob in lieu of lc 114 at ir km 153/7-8 (on sh-11) samdari-raniwara-bhildi section in district jalore epc mode
Read moreWork services for periodic maint of lt assets including cleaning, replacement of lugs, thimbles cleaning with crc and painting of old panels in tech area and repair / maint of unserviceable / damaged lt switchgear at in-living/basra/mes area at af st
Work services for periodic maint of lt assets including cleaning, replacement of lugs, thimbles cleaning with crc and painting of old panels in tech area and repair / maint of unserviceable / damaged lt switchgear at in-living/basra/mes area at af st
Read moreWork of construction commissioning of mnp sanctioned 02 nos 200 mm diameter tube wells in all strata with supply and installation of submersible pump sets testing and other allied works with 2 year defect liability period at various places in uwss
Work of construction commissioning of mnp sanctioned 02 nos&#x0d 200 mm diameter tube wells in all strata with supply and installation&#x0d of submersible pump sets testing and other allied works with 2&#x0d year defect liability period at various places in uwss
Read moreConstruction of atal path in village 2 sgm from mehandipur balaji temple to krishna temple via verma kiryana store and bajigar chauraha at km. 0/0 to 1/100
Construction of atal path in village 2 sgm from mehandipur balaji temple to&#x0d krishna temple via verma kiryana store and bajigar chauraha at km. 0/0 to 1/100
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreof your Industry type