Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bamboo Jhaadu,Blue Floor Cleaner,Distilled Water 5 L Gallon For Battery,Room Air Perfume,Brown Soft
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2023/B/4227111 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | November 19, 2023 01:14 |
End Date |
28/11/2023 ( Expired 579 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Distilled water for battery,welding rods,dash board polish,vehicle body spray,car perfume,paint blu
Read more
Deposit district information office alappuzha providing air conditioners in edit suite room voice booth and for ups installation to each floor ups installationgeneral electrical work
Deposit-district information office alappuzha-providing air conditioners in edit suite room,voice booth and for ups installation to each floor -ups installationgeneral electrical work
Read moreDeposit district information office alappuzha providing air conditioners in edit suite room voice booth and for ups installation to each floor ac installationelectrical ac work
Deposit-district information office alappuzha-providing air conditioners in edit suite room,voice booth and for ups installation to each floor -ac installationelectrical ac work
Read moreSilica gel blue (size 10-12mm), distilled water suitable for 100 ah battery set, 11 kv trip coil 30 volt suitable for stelmec make vcb with plunger (pocket type)
Silica gel blue (size 10-12mm), distilled water suitable for 100 ah battery set, 11 kv trip coil 30 volt suitable for stelmec make vcb with plunger (pocket type)
Read moreAnnual comprehensive maintenance of room air-conditioners for the work at wbp telecom h.q., ips mess alipore, bhawani bhawan (erss),cid dept. of 4th floor, bhawanipore etc at kolkata (315 days) from 20.05.2025 to 31.03.2026. (3rd call)
Annual comprehensive maintenance of room air-conditioners for the work at wbp telecom h.q., ips mess alipore, bhawani bhawan (erss),cid dept. of 4th floor, bhawanipore etc at kolkata (315 days) from 20.05.2025 to 31.03.2026. (3rd call)
Read moreHard broom,soft broom,toilet cleaner,sanitizer,room freshner,air purifier,black hit,vaporizer refil
Read more
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning and maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
Read moreReplacement of blue star make old reciprocating chillers with new eef green screw chillers for air conditioning system of vfd room of 1x500 mw sgtps mppgcl birsinghpur.
Replacement of blue star make old reciprocating chillers with new eef green screw chillers for air conditioning system of vfd room of 1x500 mw sgtps mppgcl birsinghpur.
Read moreAnnual comprehensive maintenance of room air-conditioners for the work at wbp telecom h.q., ips mess alipore, bhawani bhawan (erss), cid dept. of 4th floor, bhawanipore and south east traffic guard, kolkata from 01.05.2025 to 31.03.2026. (2nd call)
Annual comprehensive maintenance of room air-conditioners for the work at wbp telecom h.q., ips mess alipore, bhawani bhawan (erss), cid dept. of 4th floor, bhawanipore and south east traffic guard, kolkata from 01.05.2025 to 31.03.2026. (2nd call)
Read moreUpgradation augmentation of shot blasting equipment and shot blasting room including replacement of three motor driven screw lp air compressor for upgradation augmentation of production shop floor (ab and ac bay) at ins eksila
Upgradation augmentation of shot blasting equipment and shot blasting room including replacement of three motor driven screw lp air compressor for upgradation augmentation of production shop floor (ab and ac bay) at ins eksila
Read moreof your Industry type