Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road Gully Paver Block And Kerbs Complete In All Respect In Sec 5 Panchkula And All Other Works Contingent Thereto With Three Years Mtc. And Defect Liability Period Free Of Cost
|
Description |
Construction Of Road Gully Paver Block And Kerbs Complete In All Respect In Sec 5 Panchkula And All Other Works Contingent Thereto With Three Years Mtc. And Defect Liability Period Free Of Cost
|
Organisation | Government of Haryana |
Tender Id | 2023_HBC_302127_1 |
Reference Number |
HSVP/DIV-I/2023-2024/185 |
Tender Fee | 500 |
EMD | 10060 |
Tender Value | |
Place | Executive Engineer HSVP Div No. I Sec 8 Panchkula |
Link | https://etenders.hry.nic.in |
Start Date | August 07, 2023 21:50 |
End Date |
14/08/2023 ( Expired 667 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreProviding, laying, cutting, jointing and testing of 200mm od, 250mm od and 315 mm od upvc pipe sewer in ravi dass nagar and all other works contingent thereto at malout distt sri muktsar sahib
Providing, laying, cutting, jointing and testing of 200mm od, 250mm od and 315 mm od upvc pipe sewer in ravi dass nagar and all other works contingent thereto at malout distt sri muktsar sahib
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreSpecial repair of 27 mld stp based on sbr technology mechanical, electrical and instrumentation, components and all other works contingent thereto complete and cons. building of store for stp at 27 mld stp at bukanwala raod moga distt. moga
Special repair of 27 mld stp based on sbr technology mechanical, electrical and instrumentation, components and all other works contingent thereto complete and cons. building of store for stp at 27 mld stp at bukanwala raod moga distt. moga
Read moreRepair of sw sewer line by replacing with upvc pipe and construction of manholes adjacent to park no 8 on b-road, phase-11, s.a.s. nagar and all other works contingent thereto.
Repair of sw sewer line by replacing with upvc pipe and construction of manholes adjacent to park no 8 on b-road, phase-11, s.a.s. nagar and all other works contingent thereto.
Read moreJob no. 59.2025 hewp providing mali and machinery for mtc of all hort. of shrub and tree plants developed with similar concept of urban forest in sec 1 and 4 and sec 4 p ii hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreJob no. 60.2025 hewp surface dressing of master road verge along sec 1 1 p ii 4 4 p ii and 5 hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreJob no. 57.2025 hewp renovation/ improvement of park and open space play ground boundary wall in urban estate ii hisar with three year mtc and defect liability period free of cost.
Renovation/ improvement of park and open space play ground boundary wall in urban estate ii hisar
Read moreof your Industry type