Tender Details

Particulars Details
Title
Construction Of Road Gully Paver Block And Kerbs Complete In All Respect In Sec 5 Panchkula And All Other Works Contingent Thereto With Three Years Mtc. And Defect Liability Period Free Of Cost
Description
Construction Of Road Gully Paver Block And Kerbs Complete In All Respect In Sec 5 Panchkula And All Other Works Contingent Thereto With Three Years Mtc. And Defect Liability Period Free Of Cost
Organisation Government of Haryana
Tender Id 2023_HBC_302127_1
Reference
Number
HSVP/DIV-I/2023-2024/185
Tender Fee 500
EMD 10060
Tender Value
Place Executive Engineer HSVP Div No. I Sec 8 Panchkula
Link https://etenders.hry.nic.in
Start Date August 07, 2023 21:50
End Date

14/08/2023 ( Expired 669 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Special repair of various link road in market committee mukerian under special repair for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte

Special repair of various link road in market committee mukerian under special repair for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte

Read more
S r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 3

S r of various l r in mc mukerian under sr for the year 2022 23 2023 24 and 2024 25 in distt hoshiarpur including maintenance of road for 5 years one year defect liability period four years mainte group no. 3

Read more
Providing, laying, cutting, jointing and testing of 200mm od, 250mm od and 315 mm od upvc pipe sewer in ravi dass nagar and all other works contingent thereto at malout distt sri muktsar sahib

Providing, laying, cutting, jointing and testing of 200mm od, 250mm od and 315 mm od upvc pipe sewer in ravi dass nagar and all other works contingent thereto at malout distt sri muktsar sahib

Read more
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Read more
Special repair of 27 mld stp based on sbr technology mechanical, electrical and instrumentation, components and all other works contingent thereto complete and cons. building of store for stp at 27 mld stp at bukanwala raod moga distt. moga

Special repair of 27 mld stp based on sbr technology mechanical, electrical and instrumentation, components and all other works contingent thereto complete and cons. building of store for stp at 27 mld stp at bukanwala raod moga distt. moga

Read more
Providing and fixing of standby pumpset with panel in ugsr for storm water drainage and laying of rising main 250mm o/d phase-11, s.a.s. nagar and all other works contingent thereto.

Providing and fixing of standby pumpset with panel in ugsr for storm water drainage and laying of rising main 250mm o/d phase-11, s.a.s. nagar and all other works contingent thereto.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise