Tender Details
Particulars | Details |
---|---|
Title |
20. Pre Khariff Maintenance To Disty. No.13 D From Rd 00 To Tail , Sanakal Minor And Alabol Minor For The Year 2025
|
Description |
Pre Khariff Maintenance To Disty. No.13 D From Rd 00 To Tail , Sanakal Minor And Alabol Minor For The Year 2025
|
Organisation | CE-BM,LMB Basin,BBSR | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2000 |
EMD | 4400 |
Tender Value | |
Place | Jagatsinghpur |
Link |
AAAAAAAAAA Login to view |
Start Date | June 09, 2025 15:30 |
End Date |
20/06/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreRepair and water proofing of roof top dg station and paper store buildings at plant area, brbnmpl, mysuru
E-tenders are invited from eligible and qualified tenderers meeting qualification criteria for supply of the following goods and/or services/works. mstc event no.: brbnmpl/mysuru press/mmd/6/25-26/et/16
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreAAAAAAAAAA
Login to viewConsultancy services for preparation of feasibility study and detailed project report for construction of 4-lane with paved shoulder from phulbari to shillong in the state of meghalaya
Read moreAAAAAAAAAA
Login to viewDaily operation of pumps for filling water to ug and oh reservoirs,&#x0d pumping out water from the basement and other allied works at&#x0d vidyut bhavan for two years (2025-2027)
Read moreof your Industry type