Tender Details

Particulars Details
Title
Optical Fiber Cable Construction Work (Laying Plb Pipe/ Duct And Associated Works By Open Trench Method/Trenchless Technology(hdd), Optical Fiber Cable Blowing And Clamping Works Etc., For Patch Works Of Str Ofc Routes In Visakhapatnam Section Ii
Description
Optical Fiber Cable Construction Work (Laying Plb Pipe/ Duct And Associated Works By Open Trench Method/Trenchless Technology(hdd), Optical Fiber Cable Blowing And Clamping Works Etc., For Patch Works Of Str Ofc Routes In Visakhapatnam And Vizianagar
Organisation Central Public Procurement Portal 2
Tender Id 2023_BSNL_162704_2
Reference
Number
DE/TP/VM/G-1/XII/2023-24/889 Dated 28.07.2023
Tender Fee 590
EMD 40250
Tender Value -
Place O/o DE TP VIsakhapatnam
Link
View Original Tender Notice

https://etenders.gov.in

Start Date July 29, 2023 00:00
End Date
Expired 12/08/2023

Expired 1159 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Custom bid for services - laying of plb pipe by hdd / open trench method, cable blowing /pulling, splicing in ahmednagar & nanded bas for restoring faulty bbnl incremental ofc to activate pending 4g saturation enodeb sites

Custom bid for services - laying of plb pipe by hdd / open trench method, cable blowing /pulling, splicing in ahmednagar & nanded bas for restoring faulty bbnl incremental ofc to activate pending 4g saturation enodeb sites

Read more
Plb pipe,96 f optical fibre cable,dwc pipes,rcc chambers,rcc route joint indicators,plb push fit couplers,ujc 96f,ftb 96f,fdms sd type,pig tails- sc pigtail,patch chords 20 mts sc to sc pig tail,insulation tapes,20 mm hose pipe,cable ties tapes misc,causion tape,trenching cost based on the soil,pipe laying charge,cement concrete,cable pulling blowing,dwc laying charges,labour charges for testing and splicing,distribution of stores to routes,loading and unloading charges,unforeseen,coral make iris ivdx cloud server,coral make 192 port media gateway,ip phone model no grp 2604,d link 10 100 1000 giga switch 24 port network,d-link cat 6 ethernet lan cable,d-link single plate io modules,d-link 3 mtrs length patch cards,6-f ofc sm armored cable finolex make,d-link 4 u rack with accessories,cost of 40 mm plb duct for fibre laying,lc-lc fibre patch cards 3 mtrs length,d-link 12 u rack with accessories,digging of the cable trenchaning,ofc cable laying charges by using plb duct,ethernet lan cable laying charges,100 pai

Plb pipe,96 f optical fibre cable,dwc pipes,rcc chambers,rcc route joint indicators,plb push fit couplers,ujc 96f,ftb 96f,fdms sd type,pig tails- sc pigtail,patch chords 20 mts sc to sc pig tail,insulation tapes,20 mm hose pipe,cable ties tapes misc,causion tape,trenching cost based on the soil,pipe laying charge,cement concrete,cable pulling blowing,dwc laying charges,labour charges for testing and splicing,distribution of stores to routes,loading and unloading charges,unforeseen,coral make iris ivdx cloud server,coral make 192 port media gateway,ip phone model no grp 2604,d link 10 100 1000 giga switch 24 port network,d-link cat 6 ethernet lan cable,d-link single plate io modules,d-link 3 mtrs length patch cards,6-f ofc sm armored cable finolex make,d-link 4 u rack with accessories,cost of 40 mm plb duct for fibre laying,lc-lc fibre patch cards 3 mtrs length,d-link 12 u rack with accessories,digging of the cable trenchaning,ofc cable laying charges by using plb duct,ethernet lan cable laying charges,100 pai

Read more
Networking access switch with 24 port,networking access switch with 48,networking distribution switch with 48,networking core switch with 32 no,24 core single mode armored outdoor optical fiber cable.,fully loaded 24 core rack mountable liu,lc-lc duplex fiber patch cord.,cat 6a utp cable 305 mtr. roll in a box packing.,cat 6a 24 port utp black colour patch panel loaded,cat 6a information outlet including cat 6a face plate and surface mount box for face plate.,cat 6a patch chord 1 meter,cat 6a patch chord 3 meter,pvc rigid cable channel with slots and with cover.,15 u wall mount rack along with all accessories with top and bottom panels.,1 inch pvc casing caping including screw, wall plug.,3 inch pvc casing including screw, wall plug.,2-inch metal flexible pipe.,hdpe pipe size of 50 mm.,5 inch gi pipe.,installation and configuration of network switches core, distribution and access switches and integrated with existing network,turnkey job of laying of plb pipe with laying of optical fibre cable in the plb pipe

Networking access switch with 24 port,networking access switch with 48,networking distribution switch with 48,networking core switch with 32 no,24 core single mode armored outdoor optical fiber cable.,fully loaded 24 core rack mountable liu,lc-lc duplex fiber patch cord.,cat 6a utp cable 305 mtr. roll in a box packing.,cat 6a 24 port utp black colour patch panel loaded,cat 6a information outlet including cat 6a face plate and surface mount box for face plate.,cat 6a patch chord 1 meter,cat 6a patch chord 3 meter,pvc rigid cable channel with slots and with cover.,15 u wall mount rack along with all accessories with top and bottom panels.,1 inch pvc casing caping including screw, wall plug.,3 inch pvc casing including screw, wall plug.,2-inch metal flexible pipe.,hdpe pipe size of 50 mm.,5 inch gi pipe.,installation and configuration of network switches core, distribution and access switches and integrated with existing network,turnkey job of laying of plb pipe with laying of optical fibre cable in the plb pipe

Read more
Laying plb pipe and associated works by open trench method, trenchless technology(hdd), clamping, optical fiber cable pulling/blowing works etc., for str patch works in ofc routes of od-2 hyderabad division

Optical fiber cable construction work (laying plb pipe/ duct and associated works by open trench method/trenchless technology(hdd), clamping, optical fiber cable pulling/blowing works etc., for str patch works in ofc routes of od-2 hyderabad division

Read more
Optical fiber cable construction work (laying plb pipe/ duct and associated works by open trench method/trenchless technology(hdd), optical fiber cable blowing and clamping works etc., for patch works of str ofc routes in visakhapatnam section-i

Optical fiber cable construction work (laying plb pipe/ duct and associated works by open trench method/trenchless technology(hdd), optical fiber cable blowing and clamping works etc., for patch works of str ofc routes in visakhapatnam and vizianagar

Read more
Optical fiber cable construction work (laying plb pipe/ duct and associated works by open trench method/trenchless technology(hdd), optical fiber cable blowing and clamping works etc., for patch works of str ofc routes in vizianagaram sec-i

Optical fiber cable construction work (laying plb pipe/ duct and associated works by open trench method/trenchless technology(hdd), optical fiber cable blowing and clamping works etc., for patch works of str ofc routes in visakhapatnam and vizianagar

Read more
E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology (hdd), optical fiber cable pulling/blowing and clamping etc.,for patch works of str ofc routes in vizianagaram ssa -section-i

E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology (hdd), optical fiber cable pulling/blowing and clamping etc.,for patch works of str ofc routes in visakhapatnam and vizianagaram ssa

Read more
E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology (hdd), optical fiber cable pulling/blowing and clamping etc.,for patch works of str ofc routes in visakhapatnam ssa -section-ii

E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology (hdd), optical fiber cable pulling/blowing and clamping etc.,for patch works of str ofc routes in visakhapatnam and vizianagaram ssa

Read more
E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology (hdd), optical fiber cable pulling/blowing and clamping etc.,for patch works of str ofc routes in visakhapatnam ssa -section-i

E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology (hdd), optical fiber cable pulling/blowing and clamping etc.,for patch works of str ofc routes in visakhapatnam and vizianagaram ssa

Read more
e-tender for optical fiber cable construction work (laying plb pipe/ duct and associated works by open trench method/trenchless technology(hdd), clamping, optical fiber cable pulling/blowing works etc in saroornagar - rci ld ofc route for str

E-tender for optical fiber cable construction work (laying plb pipe/ duct and associated works by open trench method/trenchless technology(hdd), clamping, optical fiber cable pulling/blowing works etc in saroornagar - rci ld ofc route for str

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise