Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Invitation For Bids: Repair Of False Ceiling And Flooring At Ntpc Unchahar 🏗️ Ntpc Limited, A Leading Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Repair Of The False Ceiling And Flooring Of The Hop Conference Hall At The Feroz Gandhi Unchahar Super Thermal Power Station. 📅 Bid Submission Deadline: May 29, 2024, 11:00 Am Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, By The Specified Deadline. Keywords: Ntpc Limited, Repair, False Ceiling, Flooring, Hop Conference Hall, Ntpc Unchahar, Government Tender, Infrastructure RepairParticulars | Details |
---|---|
Title |
Repairing Of False Ceiling And Flooring Of Hop Conference Hall At Ntpc Unchahar
|
Description |
Repairing Of False Ceiling And Flooring Of Hop Conference Hall At Ntpc Unchahar
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | 2024_NTPC_87026_1 |
Reference Number |
NTPC/USSC-CPG2/9900280855 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Feroz Gandhi Unchahar Super Thermal Power Station |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=90219 |
Start Date | May 20, 2024 18:30 |
End Date |
29/05/2024 ( Expired 399 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreProcurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Procurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreIntegrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode.
Integrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode
Read moreLeasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreChartering of green tug
Chartering of green tug (green tug transition programme compliant) -manning, 
 operation, maintenance and complete technical management of service provider owned/ long 
 chartered 01 no. 60t new battery electric tug for 15 years at nmpa
Read moreDevelopment of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Read moreRequest for proposal (rfp) for developing, setting up, operating and maintaining bare commercial spaces at various metro station of lucknow metro.
Request for proposal (rfp) for developing, setting up, operating and maintaining bare 
 commercial spaces at various metro station of lucknow metro.
Read moreof your Industry type