Tender Details

Particulars Details
Title
Part Repairing Maintenance Of Gang Switch 11 Kv Grade 2 Sets 3.3 Kv Grade 4 Sets Gang Switch Of Govindpur Project And Online Oil Filtration Of Different Transformer And Fixing Of Cork Sheet And Oil Temperature Meter In 3 Mva 11 Kv/3.3 Kv Andrew Yule
Description
Part Repairing Maintenance Of Gang Switch 11 Kv Grade 2 Sets 3.3 Kv Grade 4 Sets Gang Switch Of Govindpur Project And Online Oil Filtration Of Different Transformer And Fixing Of Cork Sheet And Oil Temperature Meter In 3 Mva 11 Kv/3.3 Kv Andrew Yule
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_331075_1
Reference
Number
PE/EnM/GVP/E-Tender/24-25/97 Dt. 03.03.25
Tender Fee 0
EMD 3300
Tender Value
Place Govindpur Project
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343154
Start Date March 03, 2025 23:30
End Date

14/03/2025 ( Expired 113 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Providing and fixing of idmt relay, e/l relay with cbct, digital meter and other items in different 07 nos. 11kv and 3.3kv vcb, ocb at main 11kv/3.3kv substation for protection and safety purpose under bhurkunda colliery.

Providing and fixing of idmt relay, e/l relay with cbct, digital meter and other items in different 07 nos. 11kv and 3.3kv vcb, ocb at main 11kv/3.3kv substation for protection and safety purpose under bhurkunda colliery.

Read more
A)cork sheet bushing oil leakage stopping of 500kva,11kv/440v transformer, sl.no.800/30, ngef make at madhuban dg b)200kva,11kv/550v transformer used for birajpur c)providing and fitting of 630a mccb, 04pole for controlling of birajpur s/s at ampc.

A)cork sheet bushing oil leakage stopping of 500kva,11kv/440v transformer, sl.no.800/30, ngef make at madhuban dg b)200kva,11kv/550v transformer used for birajpur c)providing and fitting of 630a mccb, 04pole for controlling of birajpur s/s at ampc.

Read more
Repairing and fixing of wti and oit and buchholz relay along with painting of one (01) no. 11kv/3.3kv, 3mva and one no. 11kv/3.3kv, 2.5 mva transformer at 02 no. sub-station considering dgms guideline and safety of the equipment under katahra collier

Repairing and fixing of wti and oit and buchholz relay along with painting of one (01) no. 11kv/3.3kv, 3mva and one no. 11kv/3.3kv, 2.5 mva transformer at 02 no. sub-station considering dgms guideline and safety of the equipment under katahra collier

Read more
Complete repairing and rewinding of (a) 01 no. 630kva, 3.3kv/440v k-sambhav make, with sl. no. ktc/tr/630/12 and (b) 01 no. 500kva, 11kv/440v gec make with sl. no. 22426418 oil cooled transformer for colony power supply under kathara colliery.

Complete repairing and rewinding of (a) 01 no. 630kva, 3.3kv/440v k-sambhav make, with sl. no. ktc/tr/630/12 and (b) 01 no. 500kva, 11kv/440v gec make with sl. no. 22426418 oil cooled transformer for colony power supply under kathara colliery.

Read more
Transformer oil filtration testing providing of silicagel with breather cork sheet stud changing temperature meter fitting at different side of abdkc.

Transformer oil filtration testing providing of silicagel with breather cork sheet stud changing temperature meter fitting at different side of abdkc.

Read more
Repairing and replacement of insulator bushing with connection terminal and top cover an primary and secondary side cork sheet for 500kva power transformer 11kv/ 550v and installation near goushala for feeding power to borehole submersible pump set 0

Repairing and replacement of insulator bushing with connection terminal and top cover an primary and secondary side cork sheet for 500kva power transformer 11kv/ 550v and installation near goushala for feeding power to borehole submersible pump set 0

Read more
Repairing work of power transformer of 10 mva, 33kv/6.6kv of central substation nigahi project and installation, testing, commissioning of different breaker isolator and filtration of transformer oil and maintenance of transformer at sector sub stati

Repairing work of power transformer of 10 mva, 33kv/6.6kv of central substation nigahi project and installation, testing, commissioning of different breaker isolator and filtration of transformer oil and maintenance of transformer at sector sub stati

Read more
For partial repairing and installation of buchholz relay, winding and oil temperature meters of 500kva, 11kv/440v lighting transformer make kva process ltd sl no 11/1380 of sector 2 substation of east basuria colliery in respect of kusunda area.

For partial repairing and installation of buchholz relay, winding and oil temperature meters of 500kva, 11kv/440v lighting transformer make kva process ltd sl no 11/1380 of sector 2 substation of east basuria colliery in respect of kusunda area.

Read more
(a)complete repairing of 3.3kv, 400amps vcb switch andrew yule make type nflp, sl.no.3837 and (b)repairing of bucholz relay wti and oti protective device 11kv/3.3kv transformer for controlling of f.n.-2 upper side s/s of mocp f/b of amp colliery.

(a)complete repairing of 3.3kv, 400amps vcb switch andrew yule make type nflp, sl.no.3837 and (b)repairing of bucholz relay wti and oti protective device 11kv/3.3kv transformer for controlling of f.n.-2 upper side s/s of mocp f/b of amp colliery.

Read more
(a). repairing of 3mva transformer 11kv/3.3kv make-andrew yule, sl.no.-10619 charged at main sub-station of gvp project and (b). replacement of bushing insulator with stud, nut and cork sheet of 500kva, 3.3kv/550v transformer, make-marson, sl.no.-129

(a). repairing of 3mva transformer 11kv/3.3kv make-andrew yule, sl.no.-10619 charged at main sub-station of gvp project and (b). replacement of bushing insulator with stud, nut and cork sheet of 500kva, 3.3kv/550v transformer, make-marson, sl.no.-129