Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ddc 1 Detailed Design Consultancy Services For All Structures Including Elevated Viaduct, Double Decker, Single Decker/Double Decker Stations, Etc. For Corridor 1 Of Bangalore Metro Rail Project, Phase 3.
|
| Description |
Detailed Design Consultancy Services For All Structures Including Elevated Viaduct, Double Decker, Single Decker/Double Decker Stations, Entry/Exit Structures, Loops And Ramps For Road Flyovers, Multi Modal Integration Structure, Etc. For Corridor 1.
|
| Organisation | Bangalore Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_BMRCL_212499_1 |
|
Reference Number |
BMRCL/Ph3/DDC1/RFP/2024/115 |
| Tender Fee | 2360 |
| EMD | 13.15 Lakh |
| Tender Value | - |
| Place | Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=233739 |
| Start Date | December 05, 2024 15:30 |
| End Date |
Expired
21/12/2024
Expired 624 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreMaintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Maintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Read moreDdc 2-detailed design consultancy services for all structures-elevated viaduct, double decker, single decker/double decker stations etc. for corridor-1 of bangalore metro rail project, phase-3.
Detailed design consultancy services for all structures including elevated viaduct, double decker, single decker/double decker stations, entry/exit structures, loops and ramps for road flyovers, multi-modal integration structure etc. for corridor-1.
Read moreDdc 3-detailed design consultancy services for all structures-elevated viaduct, double decker, single decker/double decker stations, depots etc. for corridor-2 of bangalore metro rail project, phase-3.
Detailed design consultancy services for all structures including elevated viaduct,double decker,single decker/double decker stations,entry/exit structures,loops and ramps for road flyovers,depots,multi-modal integration structure etc. for corridor-2
Read moreFacilitation of detailed inspection of viaduct structures of dmrc operational lines.
Facilitation of detailed inspection of viaduct structures of dmrc operational lines.
Read moreFacilitation of detailed inspection of viaduct structures of dmrc operational lines.
Facilitation of detailed inspection of viaduct structures of dmrc operational lines.
Read moreDetailed design consultancy services for 14 (fourteen) elevated stations viz. kharadi chowk dandekar pul, excluding viaduct in station portion on kharadi khadakwasla corridor of pune metro rail project.
Detailed design consultancy services for 14 (fourteen) elevated stations viz. kharadi chowk dandekar pul, excluding viaduct in station portion on kharadi khadakwasla corridor of pune metro rail project.
Read moreDesign and construction of elevated viaduct and 3 nos. elevated stations including civil, associated ancillary structure, architectural finishes, -------- e and m works and peb structures on balance section of corridor-1 of agra metro at agra, u.p.
Design and construction of elevated viaduct and 3 nos. elevated stations including civil, associated ancillary structure, architectural finishes, -------- e and m works and peb structures on balance section of corridor-1 of agra metro at agra, u.p.
Read moreDesign and construction of elevated viaduct and station for corridor 1a
Design and construction of elevated viaduct and station for corridor 1a
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreof your Industry type