Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Construction Opportunity For Accommodation Huts 🏨 Shri Amarnathji Shrine Board, Under The State Government And Union Territories, Is Seeking Bids For The Construction Of Balance Works For Accommodation Huts At Pahalgam Axis. 🗺️ 🏫 Project Scope: The Project Includes The Completion Of 10 Rooms In Two Stories, Covering A Newly Installed Frame Structure With Puf Panels For Walls And Ceilings, Along With Comprehensive Electrification And Other Allied Works. This Is In Connection With The Yatra 2024 Preparations. 📅 Bid Submission Deadline: April 26, 2024, 2:00 Pm Tender Fee: Inr 1000 Emd: Inr 38000 Interested Contractors Must Submit Detailed Bids That Encompass All Aspects Of Construction, Including Material Specifications, Timelines, And Cost Estimates. Keywords: Construction, Accommodation Huts, Shri Amarnathji Shrine Board, Yatra 2024, Puf Panels, Electrification, State Govt. And Ut, Tender, Bid| Particulars | Details |
|---|---|
| Title |
Construction Of Balance Work Of Accommodation Hut Comprising Of 10 Rooms In Two Stories By Way Of Covering Of Newly Installed Frame Structure Of Huts And Providing And Fixing Of Puf Panels For Walls And Ceilings Including Electrification, Etc.
|
| Description |
Complete With Alied Works For Yatra 2024.
|
| Organisation | Shri Amarnathji Shrine Board | State Govt. and UT |
| Tender Id | 2024_SASB_247942_1 |
|
Reference Number |
SASB/eNIT/2024/12 |
| Tender Fee | 1000 |
| EMD | 38000 |
| Tender Value | - |
| Place | Pahalgam Axis |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=723304 |
| Start Date | April 09, 2024 14:30 |
| End Date |
Expired
26/04/2024
Expired 904 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
P.f. huts with puf panel (mha),p.f. huts with puf panel (mha),prefab hut / house of size 6.10 m x 7
Read more
P.f. huts with puf panel (mha),p.f. huts with puf panel (mha),prefab hut / house of size 6.10 m x 7
Read more
Repair, assembling of existing prefabricated huts / cgi huts ie. administrative block huts 05 rooms, meeting hall, four room hut, and dual room hut mrt hut, and covering of administrative hut area pre yatra . including providing safety panals
To huts after conclusion of yatra-2026 at sheshnag.
Read moreRepair / re- construction of prefab huts at outsource huts spot ( dismantled huts) by new construction wooden frame with ppgi covering for enhancement of accommodation at sheshnag camp for yatra 2023.
Repair / re- construction of prefab huts at outsource huts spot ( dismantled huts) by new construction wooden frame with ppgi covering for enhancement of accommodation at sheshnag camp for yatra 2023.
Read moreDeparture lounge, temporary rooms including fitting and repairs to g.i chain link fencing at neelgrath (6 rooms), huts for camp director / medical / newly constructed puf huts at baltal(10 nos.)
Departure lounge, temporary rooms including fitting and repairs to g.i chain link fencing at neelgrath (6 rooms), huts for camp director / medical / newly constructed puf huts at baltal(10 nos.)
Read moreUpgradation of kokernag resort (bwo)- i) development of lmv parking ii) construction of soakage pit and septic tanks for three bedroom hut iii) construction of ornamental fencing iv) lawns and dressing around newly constructed huts
Upgradation of kokernag resort (bwo)- i) development of lmv parking ii) construction of soakage pit and septic tanks for three bedroom hut iii) construction of ornamental fencing iv) lawns and dressing around newly constructed huts
Read moreConstruction of 02 no s pre fabricated poly urethane foam (puf) panel hut for 05 men accommodation for water wing at bop tash pattan and bop bamiyal fwd of 121 bn bsf under shq bsf gurdaspur (sh constructionof plinth work)
Construction of 02 no s pre fabricated poly urethane foam (puf) panel hut for 05 men accommodation for water wing at bop tash pattan and bop bamiyal fwd of 121 bn bsf under shq bsf gurdaspur (sh constructionof plinth work)
Read moreConstruction of 02 nos pre-febricated poly urethane foam (puf) pannel hut for 05 men accommodation for water wing at bop tash pattan and bop bamiyal fwd of 121 bn bsf under shq bsf gurdaspur. ( sh construction of plinth works)
Construction of 02 nos pre-febricated poly urethane foam (puf) pannel hut for 05 men accommodation for water wing at bop tash pattan and bop bamiyal fwd of 121 bn bsf under shq bsf gurdaspur. ( sh construction of plinth works)
Read moreof your Industry type