Tender Details

Particulars Details
Title
Patch Work On Khuian Sarwar To Nihal Khera Road
Description
Patch Work On Khuian Sarwar To Nihal Khera Road
Organisation CE-PWD(B and R) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 3158
EMD 20000
Tender Value
Place Abohar
Link

AAAAAAAAAA

Login to view
Start Date November 28, 2024 15:30
End Date

12/12/2024 ( 4 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Flexible connection on roof for surge arrestor

For complete deion and other details, please refer to tender

Read more
Handle (for locking the sliding door on the end walls of the lhb coaches).

For complete deion and other details, please refer to tender

Read more
Rubber stopper arrangement on bogie frame.

For complete deion and other details, please refer to tender

Read more
Construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode

Construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.

Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km&#x0d 47.700 (design chainage(tupudana to&#x0d kundibartoli) in the state of jharkhand&#x0d (total length 31.300 km) on hybrid annuity&#x0d mode.&#x0d

Read more
Develop. of 4laning of gudebellur ch.182.930 to junc with nh 167n bhootpur chincholi road near palamuru university ch.262.940 in hyderabad panaji sec of nh167 l80.01km under nh(o) in telangana on ham mode

Develop. of 4laning of gudebellur ch.182.930 to junc with nh 167n bhootpur chincholi road near palamuru university ch.262.940 in hyderabad panaji sec of nh167 l80.01km under nh(o) in telangana on ham mode

Read more
Providing speed calming measures in kallar elephant corridor from km 56/000 to km 58/400 of nh-181 ( coimbatore -ooty -gundalpet road ) under ap-2024-25 in the state of tamil nadu

Providing speed calming measures in kallar elephant corridor from km 56/000 to km 58/400 of nh-181 ( coimbatore -ooty -gundalpet road ) under ap-2024-25 in the state of tamil nadu

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise