Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fixing Of Air Diffusers In Aeration Tanks And Replacement Of Filtration Media In Stp At Nit Warangal Phase Ii Balance Works.
|
Description |
Fixing Of Air Diffusers In Aeration Tanks And Replacement Of Filtration Media In Stp At Nit Warangal Phase Ii Balance Works.
|
Organisation | National Institute of Technology Warangal | Central Govt. Ministry/Department |
Tender Id | 2025_NITW_848360_1 |
Reference Number |
41/NITW/EO/CIVIL/2024-2025 |
Tender Fee | 1180 |
EMD | 26000 |
Tender Value | |
Place | NIT Warangal |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=891807 |
Start Date | February 10, 2025 18:30 |
End Date |
03/03/2025 ( Expired 125 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConsultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreConstruction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Construction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Read moreConstruction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Read moreLt/b885-078-pm-t-9801/1001 - coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreSupply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Supply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Read moreComp maint of control panels, drivers, gear trolly, chain pully block and allied wks alongwith repair /replacement to doors, windows, flooring and related b/r wks at various e/m installations at common area and nad area under age b/r-ii at ns karanja
Comp maint of control panels, drivers, gear trolly, chain pully block and allied wks alongwith repair /replacement to doors, windows, flooring and related b/r wks at various e/m installations at common area and nad area under age b/r-ii at ns karanja
Read moreof your Industry type