Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earth Work In Excavation By Mechanical,Removal Of Existing Ipb By Manual Means And Disposal Of Dism
|
| Description |
|
| Organisation | Urban Local Bodies | |
| Tender Id | GEM/2024/R/311542 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 28, 2024 18:30 |
| End Date |
Expired
29/02/2024
Expired 959 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | Virender Hooda Contractor | Item Categories : Earth work in excavation by mechanical,Removal of existing IPB by manual means and disposal of dism | 2499473.00 | L1 |
| 2 | NEERAJ KUMAR CONTRACTOR | Item Categories : Earth work in excavation by mechanical,Removal of existing IPB by manual means and disposal of dism | 2535577.25 (Bid Price) | L2 |
| 3 | DINESH MALIK CONTRACTOR | Item Categories : Earth work in excavation by mechanical,Removal of existing IPB by manual means and disposal of dism | 2548545.00 (Bid Price) | L3 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| BPE 650VA | BPE | BPE 650VA | 2 | ₹ 3216.000 |
| DLINK SWITCH 8 PORT | D-Link | DES-1008C 10/100 Mbps Unmanaged Switch Network Switch | 6 | ₹ 4974.000 |
| RICOH Toner type 1230D Black | RICOH | RICOH Toner type 1230D Black | 5 | ₹ 21905.000 |
| HP 12A Black Original LaserJet Toner Cartridge Q2612AC | hp | HP 12A Black Original LaserJet Toner Cartridge Q2612AC | 10 | ₹ 42650.000 |
| FEVICOL SQUEEZY BOTTLE 200 gm | Fevicol | NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I | 300 | ₹ 20250.000 |
| Luminous PC 18042 - 150AH Tubular Battery | LUMINOUS | Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty | 1 | ₹ 13850.000 |
| Nanochecker 710 | NANOCHECKER 710 | Nanochecker 710 | 1 | ₹ 349000.000 |
| JK | J K | Jk Easy Copier | 300 | ₹ 48897.000 |
| Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm | LOTUS | Lotus Eazy 96 PAGES | 30 | ₹ 1080.000 |
| jungle boot direct moulded pu sole in pairs | Sk | SK | 13 | ₹ 4550.000 |
| Samsungtonercartridge MLT-D101S | SAMSUNG | MLT-D101S | 20 | ₹ 35900.000 |
| Notebook Computers-Laptop | Lenovo | Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs | 5 | ₹ 165000.000 |
| Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g | PHOENIX | SMART-20 | 9 | ₹ 31500.000 |
| VIM SOAP | Vim | VIM SOAP | 50 | ₹ 1000.000 |
| spectra FS paper | Trident Paper FS | spectra FS 75 gsm | 100 | ₹ 21000.000 |
| COPIER PAPER A4 75 GSM CT | Trident | TRIDENT SPECTRA | 100 | ₹ 17550.000 |
| Bajaj Faratta 500mm Grey Pedestal Fan | BAJAJ | Bajaj Faratta 500mm Grey Pedestal Fan | 2 | ₹ 6599.980 |
| WONDER TAPE 2" 35 MTR TRASPARENT TAPE | wonder | WONDER TAPE 2" 35 MTR TRASPARENT TAPE | 100 | ₹ 2200.000 |
| HP LaserJet Pro P1108 Printer | hp | HP LaserJet Pro P1108 | 2 | ₹ 17600.000 |
| Rubber Gloves | NA | Rubber Gloves | 100 | ₹ 5900.000 |
Comprehensive integrated solid waste management facilities including doorstep secondary collection mechanical and manual road sweeping drain cleaning transportation to designated processing centers further processing disposal of the same for 5 years
Comprehensive integrated solid waste management facilities including doorstep secondary collection mechanical and manual road sweeping drain cleaning transportation to designated processing centers further processing disposal of the same for 5 years
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreDismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreExcavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read moreEarth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Earth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreFacility management services - lumpsum based - clearing grass and removal of the rubbish up to a distance of 50 m out side the periphery of the area cleared horticulture services consumables to be provided by service provider (inclusive in contract..,facility management services - lumpsum based - ploughing the existing ground to a depth of 15cm to 25cm and watering the same horticulture services consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - rough dressing the trenched ground including breaking clods horticulture services consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - uprooting weeds from the trenched area after 10 to 15 days of its foolding with water including disposal of uprooted vegetation horticulture services consumables to be provided by service provider (inc..,facility management services - lumpsum based - fine dressing of the ground horticult
Facility management services - lumpsum based - clearing grass and removal of the rubbish up to a distance of 50 m out side the periphery of the area cleared horticulture services consumables to be provided by service provider (inclusive in contract..,facility management services - lumpsum based - ploughing the existing ground to a depth of 15cm to 25cm and watering the same horticulture services consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - rough dressing the trenched ground including breaking clods horticulture services consumables to be provided by service provider (inclusive in contract cost),facility management services - lumpsum based - uprooting weeds from the trenched area after 10 to 15 days of its foolding with water including disposal of uprooted vegetation horticulture services consumables to be provided by service provider (inc..,facility management services - lumpsum based - fine dressing of the ground horticult
Read moreof your Industry type