Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rapair And Rewinding Of 150 Tr Compressor Of Chiller Plant 2 Along With Loading And Unloading Charges Mcs Board And Display Board Transducers Cabling As Requires Alongwith Other Accessories
|
Description |
Rapair And Rewinding Of 150 Tr Compressor Of Chiller Plant 2 Along With Loading And Unloading Charges Mcs Board And Display Board Transducers Cabling As Requires Alongwith Other Accessories
|
Organisation | MAWS | State Govt. and UT |
Tender Id | 2025_MAWS_518105_1 |
Reference Number |
28570/2022/SS4-1 |
Tender Fee | 0 |
EMD | 12000 |
Tender Value | |
Place | Directorate of Municipal Administration |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=616543 |
Start Date | January 11, 2025 15:30 |
End Date |
22/01/2025 ( Expired 166 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities
Tender for annual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities
Read moreComprehensive maint, repair/maint of ac plant infra, replacement of defective condensor tubes, chiller tubes, sensor, hot water generators, existing lt panels alongwith other accessories of ac plant at tunir and common area at naval station karanja
Comprehensive maint, repair/maint of ac plant infra, replacement of defective condensor tubes, chiller tubes, sensor, hot water generators, existing lt panels alongwith other accessories of ac plant at tunir and common area at naval station karanja
Read moreSupply of crri or national test house or equivalent approved instant all weather potholes repair bituminous polymeric premix capable of performing as road repairing compound in water logged potholes along with carriage, loading and unloading at kakdw
Supply of crri or national test house or equivalent approved instant all weather potholes repair bituminous polymeric premix capable of performing as road repairing compound in water logged potholes along with carriage, loading and unloading at kakdw
Read morePre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Pre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Read moreEngagement of agency(s) for hiring 02 (two) nos.150 ft fixed boom type man lifter, 02 (two) nos.135 ft fixed boom type man lifter and 02 (two) nos.135 ft articulated boom type man lifter along with all other accessories on monthly rental basis
Engagement of agency(s) for hiring 02 (two) nos.150 ft fixed boom type man lifter, 02 (two) nos.135 ft fixed boom type man lifter and 02 (two) nos.135 ft articulated boom type man lifter along with all other accessories on monthly rental basis
Read moreDescaling of cooling tower 275 tr flow tech make induced draft of size 3 mtrs x 3 mtrs for chiller plant of capacity 225 tr installed at the roof top of the air conditioning plant along with strainers and allied works at govt. super speciality hospi
Descaling of cooling tower 275 tr flow tech make induced draft of size 3 mtrs x 3 mtrs for chiller plant of capacity 225 tr installed at the roof top of the air conditioning plant along with strainers and allied works at govt. super speciality hospi
Read moreFinalization/approval of rate and empanelment of venders for manufacturing ,supplying and installation including fitting fixing in position precast rcc citizen information board cib along with display of all prescribed information as per standard
Finalization/approval of rate and empanelment of venders for manufacturing ,supplying and installation including fitting fixing in position precast rcc citizen information board cib along with display of all prescribed information as per standard
Read moreO and m of waste heat recovery boilers, dm water plant along with zero liquid discharge, pump houses and other associated facilities in coke oven complex for a period of 2 years
O and m of waste heat recovery
 boilers, dm water plant along with zero liquid discharge,
 pump houses and other associated facilities in coke oven
 complex for a period of 2 years
Read more- replacement of faulty 2 x 7 tr scroll compressor, other spare parts i/c allied works for hpac plant at 2nd floor cdr edc san network, tape library, network room, saltlake main te bldg., saltlake kolkata (sh-repairing and servicing of hpac plant and other spare parts at 2nd floor san network, tape library, network room, cdr edc, itpc, saltlake main t.e. bldg., saltlake, ctd.
- replacement of faulty 2 x 7 tr scroll compressor, other spare parts i/c allied works for hpac plant at 2nd floor cdr edc san network, tape library, network room, saltlake main te bldg., saltlake kolkata (sh-repairing and servicing of hpac plant and other spare parts at 2nd floor san network, tape library, network room, cdr edc, itpc, saltlake main t.e. bldg., saltlake, ctd.
Read moreWork contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Read moreof your Industry type