Tender Details

Particulars Details
Title
332/Ae(e)/Kcesd Iii/Kced I/Cpwd/2023 24
Description
Sitc Of Vrv/Vrf Ac System At All Class Room/Lab And Conference Room Etc. At Newly Constructed Area Of 3rd Floor Of New Block At Nift Campus, Salt Lake, Kolkata (Sh: Providing Control Cable, 16 A Power Point And Covering The Exposed Copper And Drain Pipes In New Building Of Nift, Salt Lake, Kolkata).
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 69887
Reference
Number
332/AE(E)/KCESD-III/KCED-I/CPWD/2023-24
Tender Fee 0
EMD 9009
Tender Value
Place
Link https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243639383837243333322f41452845292f4b434553442d4949492f4b4345442d492f435057442f323032332d3234
Start Date February 27, 2024 19:23
End Date

05/03/2024 ( Expired 412 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sitc of vrf air conditioning system of 80 hp 2 x 22 hp 2 x 18 hp and associated works including the buyback of existing vrf system in 3rd floor new core lab building

Sitc of vrf air conditioning system of 80 hp 2 x 22 hp 2 x 18 hp and associated works including the buyback of existing vrf system in 3rd floor new core lab building

Read more
Supply and installation of audio visual system at 4th floor conference room, new technical building, sgtpp, wbpdcl.

Supply and installation of audio visual system at 4th floor conference room, new technical building, sgtpp, wbpdcl.

Read more
Providing ic of 1 5 tr 20 tr high wall and 3 point 65 tr floor mounted vertical split type ac system in different locations newly constructed seminar room and eye ot dept of ophthalmology research lab and demonstration biochemistry opd dept of pmr

Providing ic of 1 5 tr 20 tr high wall and 3 point 65 tr floor mounted vertical split type ac system in different locations newly constructed seminar room and eye ot dept of ophthalmology research lab and demonstration biochemistry opd dept of pmr

Read more
Wiring of newly constructed portable road weighbridge room and installation of lightning arrester with sky net at newly shifted portable road weighbridge at kuju new siding of topa project under kuju area.

Wiring of newly constructed portable road weighbridge room and installation of lightning arrester with sky net at newly shifted portable road weighbridge at kuju new siding of topa project under kuju area.

Read more
- extension of manual release and abort switch of gas suppression system, hooter extension of water leakage detection system from 2.5 floor inside switch to entrance of switch room i/c allied works at ezbc technical bldg. salt lake, ctd..

- extension of manual release and abort switch of gas suppression system, hooter extension of water leakage detection system from 2.5 floor inside switch to entrance of switch room i/c allied works at ezbc technical bldg. salt lake, ctd..

Read more
Electrical wiring of various places newly constructed rest shelter room view point industrial fan connection and multipurpose hall at krishnashila project

Electrical wiring of various places newly constructed rest shelter room view point industrial fan connection and multipurpose hall at krishnashila project

Read more
Supply of prepaid annual cable internet services and maintenance work for upkeepment of the lan, wlan, networking devices of different offices along with conference room of phe dte. at wtp campus, new town, govt. of wb for 01.04.25 to 31.03.26

Supply of prepaid annual cable internet services and maintenance work for upkeepment of the lan, wlan, networking devices of different offices along with conference room of phe dte. at wtp campus, new town, govt. of wb for 01.04.25 to 31.03.26

Read more
Arrangement of lighting arrester, new earth pits construction and connection by cu wire etc. for protection of electrical equipment and wiring of 02 newly constructed room at banwar substation of topa ocp under kuju area.

Arrangement of lighting arrester, new earth pits construction and connection by cu wire etc. for protection of electrical equipment and wiring of 02 newly constructed room at banwar substation of topa ocp under kuju area.

Read more
Renovation of room no 1009 1010, 1012, 10151016, 10171018,10191020, 1028,1029 at 10th floor ddb tower b mandi house new delhi (computer point in room nos 1012, 10191020 & shifting outdoor of split ac and providing & fixing new split ac in room no 1012, 10151016, 10191020).

Renovation of room no 1009 1010, 1012, 10151016, 10171018,10191020, 1028,1029 at 10th floor ddb tower b mandi house new delhi (computer point in room nos 1012, 10191020 & shifting outdoor of split ac and providing & fixing new split ac in room no 1012, 10151016, 10191020).

Read more
Repair and renovation, aluminium board partition and wooden work in room no.558 at 3rd floor i-tec building at sonipat campus of iit delhi.

Repair and renovation, aluminium board partition and wooden work in room no.558 at 3rd floor i-tec building at sonipat campus of iit delhi.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise