Tender Details
Particulars | Details |
---|---|
Title |
332/Ae(e)/Kcesd Iii/Kced I/Cpwd/2023 24
|
Description |
Sitc Of Vrv/Vrf Ac System At All Class Room/Lab And Conference Room Etc. At Newly Constructed Area Of 3rd Floor Of New Block At Nift Campus, Salt Lake, Kolkata (Sh: Providing Control Cable, 16 A Power Point And Covering The Exposed Copper And Drain Pipes In New Building Of Nift, Salt Lake, Kolkata).
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 69887 |
Reference Number |
332/AE(E)/KCESD-III/KCED-I/CPWD/2023-24 |
Tender Fee | 0 |
EMD | 9009 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243639383837243333322f41452845292f4b434553442d4949492f4b4345442d492f435057442f323032332d3234 |
Start Date | February 27, 2024 19:23 |
End Date |
05/03/2024 ( Expired 436 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Armo ggsip university, dwarka campus, new delhi. sh comprehensive maintenance of vrv or vrf system and cassette acs at various locations at ggsipu, dwarka campus
Armo ggsip university, dwarka campus, new delhi. sh comprehensive maintenance of vrv or vrf system and cassette acs at various locations at ggsipu, dwarka campus
Read moreDay to day operation and maintenance of pump motor set, routine maintenance at bidhannagar east ps, barrack and quarter, salt lake, kolkata-700091, bidhannagar women ps etc bidhannagar (315 days) from 21-05-2025 to 31-03- 2026. (3rd call)
Day to day operation and maintenance of pump motor set, routine maintenance at bidhannagar east ps, barrack and quarter, salt lake, kolkata-700091, bidhannagar women ps etc bidhannagar (315 days) from 21-05-2025 to 31-03- 2026. (3rd call)
Read more23/25-26/ee(kol)-ii/kolkata
Furnishing and space conditioning of the ugc-dae cst, kolkata centre building at vecc (dae) rajarhat campus, new town. sh: providing wooden platform, carpets, acoustic false ceiling and acoustic wall paneling in lecture hall at 1st floor and conference hall at 2nd floor and providing aluminium partition for dividing of space in office, laboratories and workshop i/c sitc of presentation of in conference hall, security surveillance system, presentation system in lecture hall etc.
Read moreSitc of vrf air conditioning system of 80 hp 2 x 22 hp 2 x 18 hp and associated works including the buyback of existing vrf system in 3rd floor new core lab building
Sitc of vrf air conditioning system of 80 hp 2 x 22 hp 2 x 18 hp and associated works including the buyback of existing vrf system in 3rd floor new core lab building
Read moreSupply and installation of 01 no. machine pcb protoyping system at the department of instrumentation and electronics engineering, jadavpur university salt lake campus kolkata
Supply and installation of 01 no. machine pcb protoyping system at the department of instrumentation and electronics engineering jadavpur university salt lake campus kolkata
Read moreSupply and installation of audio visual system at 4th floor conference room, new technical building, sgtpp, wbpdcl.
Supply and installation of audio visual system at 4th floor conference room, new technical building, sgtpp, wbpdcl.
Read moreProviding ic of 1 5 tr 20 tr high wall and 3 point 65 tr floor mounted vertical split type ac system in different locations newly constructed seminar room and eye ot dept of ophthalmology research lab and demonstration biochemistry opd dept of pmr
Providing ic of 1 5 tr 20 tr high wall and 3 point 65 tr floor mounted vertical split type ac system in different locations newly constructed seminar room and eye ot dept of ophthalmology research lab and demonstration biochemistry opd dept of pmr
Read moreWiring of newly constructed portable road weighbridge room and installation of lightning arrester with sky net at newly shifted portable road weighbridge at kuju new siding of topa project under kuju area.
Wiring of newly constructed portable road weighbridge room and installation of lightning arrester with sky net at newly shifted portable road weighbridge at kuju new siding of topa project under kuju area.
Read more- extension of manual release and abort switch of gas suppression system, hooter extension of water leakage detection system from 2.5 floor inside switch to entrance of switch room i/c allied works at ezbc technical bldg. salt lake, ctd..
- extension of manual release and abort switch of gas suppression system, hooter extension of water leakage detection system from 2.5 floor inside switch to entrance of switch room i/c allied works at ezbc technical bldg. salt lake, ctd..
Read moreElectrical wiring of various places newly constructed rest shelter room view point industrial fan connection and multipurpose hall at krishnashila project
Electrical wiring of various places newly constructed rest shelter room view point industrial fan connection and multipurpose hall at krishnashila project
Read moreof your Industry type