Strengthening Of Headgear Structure By Fabrication Work As Per Structure Stability Test Report Considering Safety Of Winding Operations At Pit No. 2 And Pit No. B Under Pandaveswar Colliery To Comply Dgms Violation Under Pandaveswar Area
|
| Description |
Strengthening Of Headgear Structure By Fabrication Work As Per Structure Stability Test Report Considering Safety Of Winding Operations At Pit No. 2 And Pit No. B Under Pandaveswar Colliery To Comply Dgms Violation Under Pandaveswar Area
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_340658_1 |
|
Reference Number |
GM-PND/EandM/25-26/107/495 dated 29/07/2025 |
| Tender Fee | 0 |
| EMD | 18200 |
| Tender Value | - |
| Place | Pandaveswar Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353136 |
| Start Date | August 01, 2025 22:30 |
| End Date |
Expired
11/08/2025
Expired 391 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of existing cage catcher at all four nos. of a-b and 1-2 pit for safe and smooth winding operation to comply dgms violation under pandaveswar colliery, pandaveswar area
Repairing of existing cage catcher at all four nos. of a-b and 1-2 pit for safe and smooth winding operation to comply dgms violation under pandaveswar colliery, pandaveswar area
Read moreSupply and fitting of secondary power source arrangement at mmv fan to comply dgms violation at pit no 2 and b under pandaveswar colliery, pandaveswar area
Supply and fitting of secondary power source arrangement at mmv fan to comply dgms violation at pit no 2 and b under pandaveswar colliery, pandaveswar area
Read moreStrengthening headgear structures at pit no. 1, 5 and 9 under madhaipur colliery as per stability test report to comply with dgms norms, via fabrication using various ms materials for safe and smooth winding operations, pandaveswar area
Strengthening headgear structures at pit no. 1, 5 and 9 under madhaipur colliery as per stability test report to comply with dgms norms, via fabrication using various ms materials for safe and smooth winding operations, pandaveswar area
Read moreSupply and fitting of keps indicator for safe winding operation at pit no. a-b and pit no. 1-2 to comply dgms regulation under pandaveswar colliery
Supply and fitting of keps indicator for safe winding operation at pit no. a-b and pit no. 1-2 to comply dgms regulation under pandaveswar colliery
Read moreSupply, fitting and commissioning of electrical protective system in 550 volt acb switches at underground workings to comply dgms violation and maintaining electrical safety in pit no b and 2 under pandaveswar colliery, pandaveswar area
Supply, fitting and commissioning of electrical protective system in 550 volt acb switches at underground workings to comply dgms violation and maintaining electrical safety in pit no b and 2 under pandaveswar colliery, pandaveswar area
Read moreHeadgear structure and winding cage of 9 pit chandmari section of bastacolla colliery.
Headgear structure and winding cage of 9 pit chandmari section of bastacolla colliery.
Read moreWhite washing along travelling road way to comply the dgms violation at no 2 pit of tlb unit of tilaboni colliery.
White washing along travelling road way to comply the dgms violation at no 2 pit of tlb unit of tilaboni colliery.
Read moreTesting, calibration and repairing of protection relay of ht switch gear and transformer at surface substation of pit no. 2 for safe electrical operation and to comply dgms violation under pandaveswar colliery
Testing, calibration and repairing of protection relay of ht switch gear and transformer at surface substation of pit no. 2 for safe electrical operation and to comply dgms violation under pandaveswar colliery
Read moreRenewal of structure stability test of headgear structure of 1st vertical shaft at munsar mine
Renewal of structure stability test of headgear structure of 1st vertical shaft at munsar mine
Read moreHt straight through cable joint at underground substation in different locations of pit no. 2 and pit no. b for safe electrical operation to comply dgms violations under pandaveswar colliery.
Ht straight through cable joint at underground substation in different locations of pit no. 2 and pit no. b for safe electrical operation to comply dgms violations under pandaveswar colliery.
Read moreof your Industry type