Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cpp Nurnee System Cada 2023 24 Modernization Of Field Channel From
|
Description |
Cpp Nurnee System Cada 2023 24 Modernization Of Field Channel From Spout Near Ch 11/634 Km Of Nurnee Main
Canal Phase 2
|
Organisation | Government of Kerala |
Tender Id | 2023_Irrig_604039_1 |
Reference Number |
IRR/PI/TR/867/2023_5_7_6/1 |
Tender Fee | 630 |
EMD | 7132 |
Tender Value | |
Place | Irrigation Sub Division III Chittoor |
Link | https://etenders.kerala.gov.in |
Start Date | September 18, 2023 22:30 |
End Date |
28/09/2023 ( Expired 645 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreBeneficiation of 2.312 million mt raw coal per annum from korba field of secl, bilaspur, chhatisgarh for chhabra thermal power plant of rvun
Beneficiation of 2.312 million mt raw coal per annum from korba field of secl, bilaspur, chhatisgarh for chhabra thermal power plant of rvun
Read moreBeneficiation of 2.524 million mt raw coal per annum from korba field of secl, bilaspur, chhatisgarh for kota thermal power station of rvun
Beneficiation of 2.524 million mt raw coal per annum from korba field of secl, bilaspur, chhatisgarh for kota thermal power station of rvun
Read moreSpecial repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.
Special repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.
Read moreDesign, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreUp gradation of air conditioning system of sldc server rooms and other rooms by providing centralized ac for entire sldc separate alternate lt line from other feeder and allied works as per requirement of uldc iii
Up gradation of air conditioning system of sldc server rooms and other rooms by providing centralized ac for entire sldc separate alternate lt line from other feeder and allied works as per requirement of uldc iii
Read moreof your Industry type