Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rubber Lagging Of 7 Nos. Of Conveyor Belt Drums Of 100 Ss And 200 Ss Chp Of Hloc Mine , Hlsa.
|
| Description |
Rubber Lagging Of 7 Nos. Of Conveyor Belt Drums Of 100 Ss And
200 Ss Chp Of Hloc Mine , Hlsa.
|
| Organisation | Western Coalfields Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_WCL_745658_1 |
|
Reference Number |
ch3153-enm-0025-2023-24 |
| Tender Fee | 0 |
| EMD | 2300 |
| Tender Value | - |
| Place | H L Sub Area, Chandrapur. |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1048798 |
| Start Date | February 16, 2024 15:30 |
| End Date |
Expired
22/02/2024
Expired 966 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read moreSupply of spare ht motors for compressor motor chp conveyor belt motors as per boq-tds
Supply of spare ht motors for compressor motor chp conveyor belt motors as per boq-tds
Read morePreparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreRepairing of structural support by supply and fixing of plane sheet of conveyor belt c-14 reclaim section at rajmahal chp.
Repairing of structural support by supply and fixing of plane sheet of conveyor belt c-14 reclaim section at rajmahal chp.
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreBiennial rate contract for coal cleaning and housekeeping at all routes of post crusher zone under conveyor belt 6a/b/c and s/r-1/2/3 at chp, ktps under chp(o).
Biennial rate contract for coal cleaning and housekeeping at all routes of post crusher zone under conveyor belt 6a/b/c and s/r-1/2/3 at chp, ktps under chp(o).
Read moreTransportation and installation of 1000mm belt conveyor in proposed 70lw lhd dev. district in v-top seam at baherabandh ug mine of hasdeo area.
Transportation and installation of 1000mm belt conveyor in proposed 70lw lhd dev. district in v-top seam at baherabandh ug mine of hasdeo area.
Read moreRepair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type